Country England and Wales › Region South East › Council Canterbury › Neighbourhood Beltinge & Bishopstone › Postcode CT6 6EG What's changing near CT6 6EG Within 2 km, around Beltinge & Bishopstone in Canterbury. Building, planning, schools, transport, prices and crime.
381 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.8% like-for-like prices in Beltinge & Bishopstone, 2024 → 2025 (council 0.0%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 11 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 2.0 km away New homes 9 new homes completed houses · Apr 2026 – Sep 2026
Sept 2026 1.7 km away New homes 42 new homes completed 31 flats, 11 houses · May 2025 – Sep 2026
Sept 2026 1.2 km away New homes 6 new homes completed 1 flats, 5 houses · Jun 2026 – Aug 2026
Aug 2026 1.1 km away New homes 13 new homes completed houses · Apr 2026 – Aug 2026
Aug 2026 1.8 km away School closed School closed: Fairlight Glen Independent Special School Other independent special school, other independent special school (closure)
Jul 2026 1.1 km away New homes 22 new homes completed houses · Feb 2025 – Jul 2026
Jul 2026 1.3 km away New homes 19 new homes completed houses · Feb 2026 – Jun 2026
Jun 2026 1.4 km away New homes 14 new homes completed houses · Nov 2025 – Apr 2026
Apr 2026 1.4 km away New homes 7 new homes completed houses · Apr 2026
Apr 2026 2.0 km away New homes 8 new homes completed houses · Jun 2025 – Apr 2026
Apr 2026 1.6 km away New homes 6 new homes completed
16 homes extended 2021–2025, typically adding 22 m²
37 since energy certificates began (2008)
3 in CT6 6EG itself
Extended certificate 2023 Extended certificate 2014 Extended certificate 2010 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
30 hours of spills in 2025 between them (typical neighbourhood: about 36)
12 spill events counted
Southern Water Kings Hall Wps, Herne Bay into North Sea · near bathing water: Herne Bay; Herne Bay Central 8 spills, 26 hours in 2025
1.5 km away Southern Water Eddington Lane Wps into The Plenty Brook · near bathing water: Herne Bay; Herne Bay Central 4 spills, 4 hours in 2025
1.1 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 12 planned, approved or being built and 6 running (87 MW between them). Those within 5 km are on the map above.
Hydrogen Ryse Hydrogen Limited, Thanet Way - Hydrogen Electrolysis Facility Approved, not yet built
Jul 2020 2.9 km away Battery storage Owls Hatch Road, Thanet Way - Battery Energy Storage Facility Approved, not yet built · 50 MW
Jul 2025 3.2 km away Battery storage Woodlands Farm, Calcott Hill - Battery Energy Storage Approved, not yet built · 228 MW
May 2026 3.9 km away Rooftop solar Swalecliffe Community Primary School, Bridgefield Road - Solar Panels Approved, not yet built · 200 kW
Aug 2023 5.4 km away Solar farm Britton Court Farm, Hackington Road - Solar Farm Approved, not yet built · 38 MW
Jul 2025 7.3 km away Battery storage Britton Court Farm, Hackington Road - Battery Energy Storage Approved, not yet built
Jul 2025 7.3 km away Rooftop solar St Nicholas Court Farm, Court Road - Solar Panels Approved, not yet built · 150 kW
Jul 2025 7.5 km away Rooftop solar Parker Steel, Vauxhall Industrial Road - Solar Panels Approved, not yet built · 1 MW
Oct 2024 8.1 km away Rooftop solar Amery Court Farm - Solar Array Planning application in
Oct 2021 8.5 km away Battery storage Markerstudy Business Park, Wraik Hill - Micro Energy Storage Approved, not yet built · 200 kW
Nov 2025 8.6 km away Road and street works within 1 km 9 permitted works running now or planned, 7 of them major.
Major, planned Fenoulhet Way, Herne Bay Utility repair and maintenance works · SOUTHERN WATER · Road closure
Nov 2026 to Dec 2026 500 m away Major Underdown Road, Herne Bay Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Nov 2026 650 m away Major Thanet Way, Herne And Broomfield Utility asset works · HARLAXTON ENERGY NETWORKS LIMITED · Lane closure
Oct 2026 to Oct 2026 700 m away Major Mill Lane, Herne Utility asset works · HARLAXTON ENERGY NETWORKS LIMITED · Road closure
Oct 2026 to Oct 2026 700 m away Major, planned Eddington Lane, Herne Bay Highway improvement works · KENT COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027 900 m away Major Eddington Lane, Herne Bay Highway improvement works · KENT COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027 900 m away Major Mill Lane, Herne Utility asset works · BT · Road closure
Oct 2026 to Oct 2026 900 m away Standard Reculver Road, Herne Bay New service connection · SOUTH EAST WATER · Two-way signals
Oct 2026 to Oct 2026 800 m away Minor High Street, Herne Bay New service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2013 6.4 km away Decided decided Aug 2017 9.6 km away Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 15.0 km away Decided decided Aug 2022 15.1 km away Decided decided Feb 2021 26.2 km away Decided decided Jul 2019 26.4 km away Decided Transport schemes within 20 km Running nearest: Owls Hatch Road (solar farm, 3.1 km); Molehill Farm (solar farm, 3.7 km); Woodlands Farm Solar Park (solar farm, 4.6 km); St Nicholas Court Farm (AD) (anaerobic digestion, 7.6 km); Shelford Generation Plant II (landfill gas, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.