Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
30hours of spills in 2025 between them (typical neighbourhood: about 36)
12spill events counted
Southern Water
Kings Hall Wps, Herne Bayinto North Sea · near bathing water: Herne Bay; Herne Bay Central8 spills, 26 hours in 2025
1.8 km away
Southern Water
Eddington Lane Wpsinto The Plenty Brook · near bathing water: Herne Bay; Herne Bay Central4 spills, 4 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
High Street, Herne BayNew service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Highways · South of Ashford
decided Dec 2017 29.6 km away
Decided
Thanet Extension Offshore Wind FarmGenerating Stations · approximately 8km off the east coast of Kent, in areas surrounding Thanet Offshore Wind Farm
decided Jun 2020 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.