Country England and Wales › Region South East › Council Canterbury › Neighbourhood Herne Bay Parade › Postcode CT6 5LH What's changing near CT6 5LH Within 2 km, around Herne Bay Parade in Canterbury. Building, planning, schools, transport, prices and crime.
324 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-2.8% like-for-like prices in Herne Bay Parade, 2024 → 2025 (council 0.0%)
+2% recorded crime, last 12 months vs the 12 before
On the map
New homes School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 42 new homes completed 31 flats, 11 houses · May 2025 – Sep 2026
Sept 2026 1.7 km away School closed School closed: Fairlight Glen Independent Special School Other independent special school, other independent special school (closure)
Jul 2026 400 m away New homes 22 new homes completed houses · Feb 2025 – Jul 2026
Jul 2026 1.8 km away New homes 19 new homes completed houses · Feb 2026 – Jun 2026
Jun 2026 1.8 km away New homes 14 new homes completed houses · Nov 2025 – Apr 2026
Apr 2026 1.8 km away New homes 8 new homes completed houses · Jun 2025 – Apr 2026
Apr 2026 1.5 km away New homes 51 new homes completed 1 flats, 50 houses · Oct 2025 – Mar 2026
Mar 2026 1.3 km away New homes 11 new homes completed houses · May 2025 – Jan 2026
Jan 2026 1.6 km away New homes 13 new homes completed houses · Nov 2025 – Jan 2026
Jan 2026 1.8 km away New homes 33 new homes completed houses · Dec 2024 – Nov 2025
Nov 2025 1.4 km away New homes 5 new homes completed houses · Nov 2025
Nov 2025 1.8 km away New homes 6 new homes completed
16 homes extended 2021–2025, typically adding 24 m²
35 since energy certificates began (2008)
4 in CT6 5LH itself
Extended certificate 2025 Extended certificate 2023 Extended certificate 2023 Extended certificate 2018 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
30 hours of spills in 2025 between them (typical neighbourhood: about 36)
12 spill events counted
Southern Water Kings Hall Wps, Herne Bay into North Sea · near bathing water: Herne Bay; Herne Bay Central 8 spills, 26 hours in 2025
1.7 km away Southern Water Eddington Lane Wps into The Plenty Brook · near bathing water: Herne Bay; Herne Bay Central 4 spills, 4 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 12 planned, approved or being built and 6 running (87 MW between them). Those within 5 km are on the map above.
Hydrogen Ryse Hydrogen Limited, Thanet Way - Hydrogen Electrolysis Facility Approved, not yet built
Jul 2020 2.2 km away Battery storage Owls Hatch Road, Thanet Way - Battery Energy Storage Facility Approved, not yet built · 50 MW
Jul 2025 2.8 km away Battery storage Woodlands Farm, Calcott Hill - Battery Energy Storage Approved, not yet built · 228 MW
May 2026 4.4 km away Rooftop solar Swalecliffe Community Primary School, Bridgefield Road - Solar Panels Approved, not yet built · 200 kW
Aug 2023 4.5 km away Solar farm Britton Court Farm, Hackington Road - Solar Farm Approved, not yet built · 38 MW
Jul 2025 7.2 km away Battery storage Britton Court Farm, Hackington Road - Battery Energy Storage Approved, not yet built
Jul 2025 7.2 km away Battery storage Markerstudy Business Park, Wraik Hill - Micro Energy Storage Approved, not yet built · 200 kW
Nov 2025 7.9 km away Rooftop solar Amery Court Farm - Solar Array Planning application in
Oct 2021 8.3 km away Rooftop solar Parker Steel, Vauxhall Industrial Road - Solar Panels Approved, not yet built · 1 MW
Oct 2024 8.4 km away Rooftop solar St Nicholas Court Farm, Court Road - Solar Panels Approved, not yet built · 150 kW
Jul 2025 8.5 km away Road and street works within 1 km 5 permitted works running now or planned, 2 of them major.
Major Underdown Road, Herne Bay Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Nov 2026 450 m away Major, planned Fenoulhet Way, Herne Bay Utility repair and maintenance works · SOUTHERN WATER · Road closure
Nov 2026 to Dec 2026 700 m away Standard High Street, Herne Bay New service connection · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Oct 2026 to Oct 2026 50 m away Standard Pier Avenue, Herne Bay New service connection · UK POWER NETWORKS SOUTH EASTERN · No carriageway incursion
Oct 2026 to Oct 2026 250 m away Minor High Street, Herne Bay New service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2013 5.5 km away Decided decided Aug 2017 10.7 km away Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 14.2 km away Decided decided Aug 2022 16.1 km away Decided decided Feb 2021 25.2 km away Decided decided Jul 2019 25.4 km away Decided Transport schemes within 20 km Running nearest: Owls Hatch Road (solar farm, 2.7 km); Molehill Farm (solar farm, 3.0 km); Woodlands Farm Solar Park (solar farm, 5.1 km); Shelford Generation Plant II (landfill gas, 8.1 km); Shelford Landfill Scheme (landfill gas, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.