Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
New-home postcodes with fewer than 5 homes are counted above but not listed. 31 postcodes nearby had new homes completed in the last two years.
Jul 2025 8.0 km away
Rooftop solar
Ewell Farm, Graveney Road -Solar PanelsApproved, not yet built · 410 kW
Jul 2025 8.0 km away
Rooftop solar
Parker Steel, Vauxhall Industrial Road - Solar PanelsApproved, not yet built · 1 MW
Oct 2024 8.2 km away
Running nearest: Molehill Farm (solar farm, 4.7 km); Owls Hatch Road (solar farm, 5.5 km); Cleve Hill Solar Project (solar farm, 7.4 km); Cleve Hill Solar Project (battery storage, 7.4 km); Woodlands Farm Solar Park (solar farm, 7.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · South of Ashford
decided Dec 2017 24.6 km away
Decided
Stonestreet Green SolarGenerating Stations · Land at Aldington, southeast of Ashford in Kent
decided Oct 2025 27.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.