What's changing near CT2 7JP
Within 2 km, around Canterbury St Stephen's in Canterbury. Building, planning, schools, transport, prices and crime.
126new homes completed within 2 km, last 2 years
41homes given permission on brownfield sites since 2021
-1.9%like-for-like prices in Canterbury St Stephen's, 2024 → 2025 (council 0.0%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedflats · Apr 2026
Apr 2026
1.7 km away - New homes
79 new homes completedflats · Jun 2025 – Dec 2025
Dec 2025
700 m away - New homes
34 new homes completedflats · Mar 2025
Mar 2025
1.3 km away - New schoolFeb 2023
2.0 km away - Planning permissionJun 2021
1.3 km away - Planning permissionMay 2021
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
24homes extended 2021–2025, typically adding 22 m²
44since energy certificates began (2008)
0in CT2 7JP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
1hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
- Southern Water
Wincheap Canterbury Csointo The Great Stour3 spills, 1 hours in 2025
1.6 km away - Southern Water
Kingsmead Road Canterbury Csointo Great Stour River1 spills, 0 hours in 2025
650 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
21 planned, approved or being built and 7 running (103 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Kings School Recreation Centre, St Stephens Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2025
300 m away - Rooftop solar
University Of Kent, Templeman Library - Solar PV panelsApproved, not yet built · 270 kW
Dec 2024
1.3 km away - Rooftop solar
Parker Steel, Vauxhall Industrial Road - Solar PanelsApproved, not yet built · 1 MW
Oct 2024
2.0 km away - Rooftop solar
Morrisons, Ten Perch Road - Solar Pv PanelsApproved, not yet built · 420 kW
Dec 2022
2.1 km away - Rooftop solar
Kent And Canterbury Hospital, Ethelbert Road - Solar PanelsApproved, not yet built · 940 kW
May 2026
2.4 km away - Rooftop solar
Kent Canterbury Hospital, Ethelbert Road - Solar PanelsPlanning application in · 850 kW
Apr 2026
2.4 km away - Solar farm
Britton Court Farm, Hackington Road - Solar FarmApproved, not yet built · 38 MW
Jul 2025
3.0 km away - Battery storage
Britton Court Farm, Hackington Road - Battery Energy StorageApproved, not yet built
Jul 2025
3.0 km away - Rooftop solar
Amery Court Farm - Solar ArrayPlanning application in
Oct 2021
3.6 km away - Rooftop solar
Howfield Farm, Howfield Lane - Solar PanelsApproved, not yet built · 400 kW
Oct 20254.1 km away
Road and street works within 1 km
16 permitted works running now or planned, 13 of them major.
- Major
St Stephen'S Court, CanterburyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Two-way signals
Aug 2026 to Nov 2026
0 m away - Major
Market Way, CanterburyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Oct 2026 to Nov 2026
300 m away - Major, planned
Blackfriars Street, CanterburyNew service connection · UK POWER NETWORKS SOUTH EASTERN · No carriageway incursion
Nov 2026 to Nov 2026
650 m away - Major
Blackfriars Street, CanterburyNew service connection · UK POWER NETWORKS SOUTH EASTERN · No carriageway incursion
Nov 2026 to Nov 2026
650 m away - Major
Roper Road, CanterburyRemedial works · SOUTH EAST WATER · Road closure
Dec 2026 to Dec 2026
700 m away - Major, planned
King Street, CanterburyUtility asset works · BT · Road closure
Nov 2026 to Nov 2026
700 m away - Major
King Street, CanterburyRemedial works · SOUTHERN GAS NETWORKS PLC · Road closure
Jan 2027 to Jan 2027
750 m away - Major
St Dunstans Street, CanterburyOptional permit (no fee) e.g. for traffic management etc · KENT COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
750 m away - Major, planned
St Peter'S Place, CanterburyUtility repair and maintenance works · SOUTHERN WATER · Road closure
Jan 2027 to Jan 2027
750 m away
Major infrastructure projects within 30 km
- Decideddecided Aug 2017
11.7 km away - Decided
Cleve Hill Solar ParkGenerating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020
12.2 km away - Decideddecided Feb 2013
14.5 km away - Decideddecided Aug 2022
20.0 km away - Decideddecided Dec 2017
20.5 km away - Decideddecided Oct 2025
22.9 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Shelford Landfill Scheme (landfill gas, 1.8 km); Shelford Generation Plant II (landfill gas, 1.9 km); Littlebourne (solar farm, 4.8 km); Woodlands Farm Solar Park (solar farm, 5.2 km); Nickle Farm (rooftop solar, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.