Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
43hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
Southern Water
Canterbury Wastewater Treatment Wksinto River Great Stour7 spills, 42 hours in 2025
1.7 km away
Southern Water
Wincheap Canterbury Csointo The Great Stour3 spills, 1 hours in 2025
2.0 km away
Southern Water
Kingsmead Road Canterbury Csointo Great Stour River1 spills, 0 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
St Stephen'S Hill, CanterburyHighway improvement works · KENT COUNTY COUNCIL · Multi-way signals
Feb 2027 to Feb 2027 1000 m away
Minor
Riverdale Road, CanterburyUtility repair and maintenance works · BT · Temp obstruction 15 minute delay
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Feb 2021 24.2 km away
Decided
Kemsley Paper Mill (K4) CHP Plant Generating Stations · Land within the south-eastern part of the Kemsley Paper Mill, Kemsley, Sittingbourne.
decided Jul 2019 24.2 km away
Pre-application
Shepway Energy ParkGenerating Stations · Located on land north of Newchurch and 6km south of Ashford in Kent.
application due November 2027 28.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.