Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
58hours of spills in 2025 between them (typical neighbourhood: about 36)
12spill events counted
Southern Water
Canterbury Wastewater Treatment Wksinto River Great Stour7 spills, 42 hours in 2025
1.9 km away
Southern Water
Fordwich Road Sturry Ceointo Great Stour River5 spills, 16 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Utility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026 350 m away
Minor
Homewood Road, SturryUtility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 200 m away
Minor
Risdon Close, SturryUtility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Feb 2021 26.7 km away
Decided
Kemsley Paper Mill (K4) CHP Plant Generating Stations · Land within the south-eastern part of the Kemsley Paper Mill, Kemsley, Sittingbourne.
decided Jul 2019 26.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.