Country England and Wales › Region South East › Council Thanet › Neighbourhood Ramsgate Harbour › Postcode CT11 9LW What's changing near CT11 9LW Within 2 km, around Ramsgate Harbour in Thanet. Building, planning, schools, transport, prices and crime.
214 new homes completed within 2 km, last 2 years
200 homes given permission on brownfield sites since 2021
+3.0% like-for-like prices in Ramsgate Harbour, 2024 → 2025 (council +0.1%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first School closed School closed: St Lawrence College Other independent school, other independent school (closure)
Aug 2026 1.4 km away New homes 51 new homes completed 4 flats, 47 houses · Mar 2025 – Aug 2026
Aug 2026 1.9 km away New homes 24 new homes completed 18 flats, 6 houses · Mar 2026 – Jul 2026
Jul 2026 2.0 km away New homes 16 new homes completed 4 flats, 12 houses · Feb 2025 – Mar 2026
Mar 2026 2.0 km away New homes 19 new homes completed houses · Jun 2025 – Mar 2026
Mar 2026 2.0 km away New homes 6 new homes completed flats · Jan 2026
Jan 2026 650 m away New homes 9 new homes completed flats · Dec 2025
Dec 2025 1.9 km away New homes 11 new homes completed houses · Nov 2025
Nov 2025 1.7 km away New homes 8 new homes completed 2 flats, 6 houses · Apr 2025 – Jun 2025
Jun 2025 800 m away New homes 10 new homes completed flats · May 2025
May 2025 700 m away New homes 9 new homes completed flats · Mar 2025
Mar 2025 1.9 km away New homes 9 new homes completed flats · Feb 2025
Feb 2025 2.0 km away 53 homes extended 2021–2025, typically adding 24 m²
113 since energy certificates began (2008)
0 in CT11 9LW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
23 hours of spills in 2025 between them (typical neighbourhood: about 36)
8 spill events counted
Southern Water Thanet Road Ramsgate Cso into North Sea · near bathing water: Broadstairs, Stone Bay; Broadstairs, Viking Bay; Ramsgate Sands; Ramsgate Western Undercliffe 6 spills, 17 hours in 2025
1.6 km away Southern Water Westcliff Pumping Station into Controlled Sea · near bathing water: Ramsgate Western Undercliffe; Ramsgate Sands 2 spills, 6 hours in 2025
950 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 11 running (157 MW between them). Those within 5 km are on the map above.
Rooftop solar Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Approved, not yet built · 390 kW
Apr 2025 700 m away Battery storage Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Approved, not yet built · 400 kW
Apr 2025 700 m away Rooftop solar The Corporation Of St Lawrence College, College Road - Solar Panels Approved, not yet built · 350 kW
Jul 2023 1.4 km away Rooftop solar Laleham Gap School, Ozengell Place - Solar Photovoltaics Panels Approved, not yet built · 200 kW
May 2025 2.5 km away Rooftop solar Fuji Film Sericol, Patricia Way - Solar Panels Approved, not yet built · 960 kW
Dec 2022 2.5 km away Battery storage Hornet Close, Pysons Road Industrial Estate - Energy Storage Facility Approved, not yet built · 200 kW
Apr 2025 2.8 km away Rooftop solar East Kent College, Ramsgate Road - Solar Panels Approved, not yet built · 290 kW
Dec 2025 3.1 km away Battery storage Sacketts Hill Farm - Battery Energy Storage System Approved, not yet built · 22 MW
Aug 2025 4.1 km away Battery storage Ebbsfleet Lane - Battery Storage System Approved, not yet built · 50 MW
Jan 2026 4.5 km away Hydrogen Manston Road - Hydrogen Facility, Educational & Offices Planning application in · 34 MW
Road and street works within 1 km 24 permitted works running now or planned, 17 of them major.
Major Cannonbury Road, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Oct 2026 100 m away Major Grange Road, Ramsgate Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Oct 2026 150 m away Major Edith Road, Ramsgate Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Oct 2026 150 m away Major West Cliff Road, Ramsgate Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Oct 2026 200 m away Major Chapel Place Lane, Ramsgate Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Oct 2026 550 m away Major Liverpool Lawn, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Feb 2027 to Feb 2027 600 m away Major Sion Hill, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Feb 2027 to Feb 2027 600 m away Major Prospect Terrace, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Feb 2027 to Feb 2027 600 m away Major, planned High Street, Ramsgate Utility repair and maintenance works · SOUTHERN WATER · Road closure
Jan 2027 to Jan 2027 700 m away Major infrastructure projects within 30 km Decided decided Aug 2022 4.3 km away Decided decided Aug 2017 11.8 km away Decided decided Jun 2020 14.2 km away Decided decided Feb 2013 23.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Manston Solar Farm extension (Westwood) (solar farm, 3.3 km); Manston Solar Farm (solar farm, 3.7 km); Continental Approach - Solar Panels (rooftop solar, 4.2 km); Thorne Farm (solar farm, 4.3 km); Ebbsfleet Farm Solar Farm (solar farm, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.