Country England and Wales › Region South East › Council Thanet › Neighbourhood Ramsgate Harbour › Postcode CT11 8BS What's changing near CT11 8BS Within 2 km, around Ramsgate Harbour in Thanet. Building, planning, schools, transport, prices and crime.
60 new homes completed within 2 km, last 2 years
184 homes given permission on brownfield sites since 2021
+3.0% like-for-like prices in Ramsgate Harbour, 2024 → 2025 (council +0.1%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first School closed School closed: St Lawrence College Other independent school, other independent school (closure)
Aug 2026 1.1 km away New homes 6 new homes completed flats · Jan 2026
Jan 2026 750 m away School closed School closed: Bradstow School Community special school, community special school (closure)
Dec 2025 2.0 km away New homes 9 new homes completed flats · Dec 2025
Dec 2025 1.8 km away New homes 8 new homes completed 2 flats, 6 houses · Apr 2025 – Jun 2025
Jun 2025 750 m away New homes 10 new homes completed flats · May 2025
May 2025 700 m away Planning permission Apr 2024 550 m away Planning permission Feb 2024 450 m away Planning permission Feb 2024 1.4 km away Planning permission
30 homes extended 2021–2025, typically adding 26 m²
73 since energy certificates began (2008)
0 in CT11 8BS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
23 hours of spills in 2025 between them (typical neighbourhood: about 36)
8 spill events counted
Southern Water Thanet Road Ramsgate Cso into North Sea · near bathing water: Broadstairs, Stone Bay; Broadstairs, Viking Bay; Ramsgate Sands; Ramsgate Western Undercliffe 6 spills, 17 hours in 2025
350 m away Southern Water Westcliff Pumping Station into Controlled Sea · near bathing water: Ramsgate Western Undercliffe; Ramsgate Sands 2 spills, 6 hours in 2025
1.7 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 10 running (152 MW between them). Those within 5 km are on the map above.
Rooftop solar Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Approved, not yet built · 390 kW
Apr 2025 900 m away Battery storage Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Approved, not yet built · 400 kW
Apr 2025 900 m away Rooftop solar The Corporation Of St Lawrence College, College Road - Solar Panels Approved, not yet built · 350 kW
Jul 2023 1.1 km away Rooftop solar East Kent College, Ramsgate Road - Solar Panels Approved, not yet built · 290 kW
Dec 2025 2.1 km away Rooftop solar Fuji Film Sericol, Patricia Way - Solar Panels Approved, not yet built · 960 kW
Dec 2022 2.3 km away Battery storage Hornet Close, Pysons Road Industrial Estate - Energy Storage Facility Approved, not yet built · 200 kW
Apr 2025 2.5 km away Rooftop solar Laleham Gap School, Ozengell Place - Solar Photovoltaics Panels Approved, not yet built · 200 kW
May 2025 3.0 km away Battery storage Sacketts Hill Farm - Battery Energy Storage System Approved, not yet built · 22 MW
Aug 2025 3.9 km away Hydrogen Manston Road - Hydrogen Facility, Educational & Offices Planning application in · 34 MW
Mar 2026 5.2 km away Solar farm Hengrove Farm, Shottendane Road - Solar Farm Approved, not yet built · 30 MW
Road and street works within 1 km 27 permitted works running now or planned, 24 of them major.
Major Bellevue Road, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Mar 2027 to Mar 2027 50 m away Major Victoria Road, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Mar 2027 to Mar 2027 100 m away Major Avenue Road, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Mar 2027 to Mar 2027 100 m away Major Arklow Square, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Mar 2027 to Mar 2027 100 m away Major Portland Court, Ramsgate Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Oct 2026 250 m away Major Packers Lane, Ramsgate Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Oct 2026 300 m away Major Hardres Road, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Jan 2027 to Feb 2027 400 m away Major Victoria Parade, Ramsgate Optional permit (no fee) e.g. for traffic management etc · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Aug 2026 to Oct 2026 400 m away Major St Lukes Avenue, Ramsgate Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Jan 2027 to Feb 2027 400 m away Major infrastructure projects within 30 km Decided decided Aug 2022 5.3 km away Decided decided Jun 2020 13.0 km away Decided decided Aug 2017 13.1 km away Decided decided Feb 2013 24.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Manston Solar Farm extension (Westwood) (solar farm, 4.0 km); Continental Approach - Solar Panels (rooftop solar, 4.3 km); Manston Solar Farm (solar farm, 4.4 km); Queen Elizabeth The Queen Mothers Hospital (solar farm, 5.3 km); Thorne Farm (solar farm, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.