Country England and Wales › Region South East › Council Thanet › Neighbourhood Dane Valley & Northdown Hill › Postcode CT10 3HX What's changing near CT10 3HX Within 2 km, around Dane Valley & Northdown Hill in Thanet. Building, planning, schools, transport, prices and crime.
69 new homes completed within 2 km, last 2 years
164 homes given permission on brownfield sites since 2021
-0.2% like-for-like prices in Dane Valley & Northdown Hill, 2024 → 2025 (council +0.1%)
-7% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 13 new homes completed flats · Mar 2026
Mar 2026 900 m away New homes 6 new homes completed houses · Feb 2026
Feb 2026 550 m away New homes 12 new homes completed houses · Mar 2025 – Feb 2026
Feb 2026 950 m away New homes 6 new homes completed houses · Feb 2026
Feb 2026 650 m away New homes 12 new homes completed 2 flats, 10 houses · Jun 2025 – Oct 2025
Oct 2025 850 m away New school Sept 2025 700 m away New homes 6 new homes completed flats · Jun 2025
Jun 2025 2.0 km away Planning permission Feb 2024 950 m away Planning permission Feb 2024 1.6 km away Planning permission 3 homes extended 2021–2025, typically adding 19 m²
16 since energy certificates began (2008)
2 in CT10 3HX itself
Extended certificate 2015 Extended certificate 2013 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 9 running (136 MW between them). Those within 5 km are on the map above.
Battery storage Sacketts Hill Farm - Battery Energy Storage System Approved, not yet built · 22 MW
Aug 2025 1.4 km away Battery storage Hornet Close, Pysons Road Industrial Estate - Energy Storage Facility Approved, not yet built · 200 kW
Apr 2025 2.1 km away Rooftop solar Fuji Film Sericol, Patricia Way - Solar Panels Approved, not yet built · 960 kW
Dec 2022 2.3 km away Rooftop solar East Kent College, Ramsgate Road - Solar Panels Approved, not yet built · 290 kW
Dec 2025 2.5 km away Rooftop solar Laleham Gap School, Ozengell Place - Solar Photovoltaics Panels Approved, not yet built · 200 kW
May 2025 3.4 km away Rooftop solar The Corporation Of St Lawrence College, College Road - Solar Panels Approved, not yet built · 350 kW
Jul 2023 3.5 km away Rooftop solar Hengrove Farm House, Shottendane Road - Solar Panels Approved, not yet built · 150 kW
Aug 2025 4.2 km away Rooftop solar Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Approved, not yet built · 390 kW
Apr 2025 4.2 km away Battery storage Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Approved, not yet built · 400 kW
Apr 2025 4.2 km away Solar farm Hengrove Farm, Shottendane Road - Solar Farm
Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major Prince Andrew Road, Broadstairs Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Sept 2026 to Nov 2026 550 m away Major, planned Church Street, Broadstairs Works for Rail Purposes · NETWORK RAIL · Road closure
Nov 2026 to Nov 2026 750 m away Major Church Street, Broadstairs Utility repair and maintenance works · SOUTHERN WATER · Road closure
Jan 2027 to Feb 2027 800 m away Minor Arlington Gardens, Margate Utility repair and maintenance works · SOUTHERN WATER · Some carriageway incursion
Dec 2026 to Dec 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Aug 2022 5.7 km away Decided decided Jun 2020 10.5 km away Decided decided Aug 2017 14.2 km away Decided decided Feb 2013 23.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Queen Elizabeth The Queen Mothers Hospital (solar farm, 2.1 km); Continental Approach - Solar Panels (rooftop solar, 2.3 km); Manston Solar Farm extension (Westwood) (solar farm, 4.0 km); Manston Solar Farm (solar farm, 4.4 km); Thorne Farm (solar farm, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.