Country England and Wales › Region South East › Council Thanet › Neighbourhood Westwood, Northwood & Bromstone › Postcode CT10 2LS What's changing near CT10 2LS Within 2 km, around Westwood, Northwood & Bromstone in Thanet. Building, planning, schools, transport, prices and crime.
597 new homes completed within 2 km, last 2 years
150 homes given permission on brownfield sites since 2021
-5.7% like-for-like prices in Westwood, Northwood & Bromstone, 2024 → 2025 (council +0.1%)
-8% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 12 new homes completed houses · Mar 2026 – Oct 2026
Oct 2026 1.4 km away New homes 44 new homes completed flats · Jul 2025 – Oct 2026
Oct 2026 1.7 km away New homes 33 new homes completed 12 flats, 21 houses · Dec 2025 – Oct 2026
Oct 2026 1.4 km away New homes 6 new homes completed houses · Sep 2025 – Oct 2026
Oct 2026 1.4 km away New homes 14 new homes completed houses · Nov 2024 – Sep 2026
Sept 2026 1.5 km away New homes 9 new homes completed 2 flats, 7 houses · Feb 2025 – Sep 2026
Sept 2026 1.6 km away School closed School closed: St Lawrence College Other independent school, other independent school (closure)
Aug 2026 1.9 km away New homes 19 new homes completed 2 flats, 17 houses · Feb 2025 – Aug 2026
Aug 2026 1.7 km away New homes 9 new homes completed houses · Oct 2025 – Jul 2026
Jul 2026 1.5 km away New homes 13 new homes completed 3 flats, 10 houses · Oct 2025 – Jun 2026
Jun 2026 1.7 km away New homes 18 new homes completed 2 flats, 16 houses · Feb 2025 – Jun 2026
Jun 2026 1.8 km away New homes 20 new homes completed
11 homes extended 2021–2025, typically adding 22 m²
20 since energy certificates began (2008)
1 in CT10 2LS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 10 running (152 MW between them). Those within 5 km are on the map above.
Battery storage Hornet Close, Pysons Road Industrial Estate - Energy Storage Facility Approved, not yet built · 200 kW
Apr 2025 450 m away Rooftop solar Fuji Film Sericol, Patricia Way - Solar Panels Approved, not yet built · 960 kW
Dec 2022 650 m away Battery storage Sacketts Hill Farm - Battery Energy Storage System Approved, not yet built · 22 MW
Aug 2025 1000 m away Rooftop solar Laleham Gap School, Ozengell Place - Solar Photovoltaics Panels Approved, not yet built · 200 kW
May 2025 1.6 km away Rooftop solar The Corporation Of St Lawrence College, College Road - Solar Panels Approved, not yet built · 350 kW
Jul 2023 1.9 km away Rooftop solar East Kent College, Ramsgate Road - Solar Panels Approved, not yet built · 290 kW
Dec 2025 2.0 km away Rooftop solar Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Approved, not yet built · 390 kW
Apr 2025 2.6 km away Battery storage Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Approved, not yet built · 400 kW
Apr 2025 2.6 km away Solar farm Hengrove Farm, Shottendane Road - Solar Farm Approved, not yet built · 30 MW
Aug 2024 3.3 km away Hydrogen Manston Road - Hydrogen Facility, Educational & Offices Planning application in · 34 MW
Road and street works within 1 km 12 permitted works running now or planned.
Standard The Silvers, Broadstairs Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Oct 2026 250 m away Standard Northwood Road, Broadstairs Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Oct 2026 250 m away Standard Beech Drive, Broadstairs Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Nov 2026 to Nov 2026 300 m away Standard Larch Close, Broadstairs Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Nov 2026 to Nov 2026 400 m away Standard Margate Road, Ramsgate New service connection · HARLAXTON ENERGY NETWORKS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away Standard Grenville Way, Broadstairs Utility asset works · BT · Priority working
Oct 2026 to Nov 2026 800 m away Standard Grenville Way, Broadstairs Utility asset works · BT · Some carriageway incursion
Nov 2026 to Dec 2026 900 m away Standard Collingwood Close, Broadstairs Utility asset works · BT · Some carriageway incursion
Oct 2026 to Nov 2026 900 m away Standard Millfield Road, Ramsgate Utility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away Minor Major infrastructure projects within 30 km Decided decided Aug 2022 4.2 km away Decided decided Jun 2020 12.1 km away Decided decided Aug 2017 12.7 km away Decided decided Feb 2013 22.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Continental Approach - Solar Panels (rooftop solar, 1.6 km); Queen Elizabeth The Queen Mothers Hospital (solar farm, 2.4 km); Manston Solar Farm extension (Westwood) (solar farm, 2.5 km); Manston Solar Farm (solar farm, 2.9 km); Thorne Farm (solar farm, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.