Looking around…
What's changing near CR4 2GL
Within 2 km, around Mitcham East in Merton. Building, planning, schools, transport, prices and crime.
353new homes completed within 2 km, last 2 years
825homes given permission on brownfield sites since 2021
-0.3%like-for-like prices in Mitcham East, 2024 → 2025 (council +2.1%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedflats · Oct 2026
planned Oct 2026
1.4 km away - New homes
5 new homes completedflats · Oct 2026
planned Oct 2026
2.0 km away - New homes
42 new homes completedflats · Oct 2026
Oct 2026
1.9 km away - New homes
52 new homes completedflats · Oct 2026
Oct 2026
1.9 km away - New homes
6 new homes completedflats · Jul 2026
Jul 2026
1.6 km away - New homes
9 new homes completedhouses · Feb 2026
Feb 2026
1.2 km away - New homes
14 new homes completedflats · Dec 2025
Dec 2025
1.5 km away - New homes
29 new homes completedflats · Nov 2025
Nov 2025
1.2 km away - School closed
School closed: Goldfinch Primary SchoolAcademy sponsor led, primary (closure)
Aug 2025
1.6 km away - New homes
6 new homes completedflats · Aug 2025
Aug 2025
400 m away - New homes
6 new homes completedflats · Jul 2025
Jul 2025
1.5 km away - New homes
6 new homes completedflats · Jul 2025
Jul 2025
1.3 km away - New homes
Planning applications within 500 m
10applications in the last 12 months
7approved · 1 refused
2still being decided
20net new homes in approved schemes since 2023
- Application Under Consideration
2, SANDY LANE, CR4 2HDAPPLICATION TO DEMOLISH EXISTING GARAGE TO THE REAR, REPLACE WITH NEW DWELLING DWELLING AND ASSOCIATED AMENITY SPACE, AIR SOURCE HEAT PUMP, CYCLE PARKINGMerton 25/P0919/INVALID · All Other · 1 homes proposed
Aug 2026
150 m away - Application Under Consideration
3, EDGEHILL ROAD, CR4 2HYDEMOLITION OF EXISTING SHEDS AND ERECTION OF NEW SINGLE STOREYOUTBUILDING IN THE REAR GARDEN FOR USE INCIDENTAL TO MAIN DWELLINGHOUSEMerton 26/HOUSE/1766 · Householder
Aug 2026
200 m away - Approved
54, EDGEHILL ROAD, CR4 2HUAPPLICATION FOR THE ERECTION OF A PROPOSED PART SINGLE AND PART TWO STOREY REAR EXTENSION, TWO STOREY SIDE EXTENSION AND REAR ROOF EXTENSIONS (HIP TO GABLE AND REAR DORMER) WITH 3 X NEW ROOFLIGHTS TO THE FRONT ELEVATION.Merton 26/HOUSE/1233 · Householder
Jul 2026
300 m away - Approved
52, St James' Road, CR4 2DA52 ST JAMES ROADMerton 26/LDCP/0290 · All Other
Feb 2026
500 m away - Refused
3, EDGEHILL ROAD, CR4 2HYDEMOLITION OF EXISTING SHEDS AND ERECTION OF NEW SINGLE STOREY OUTBUILDING IN THE REAR GARDEN FOR USE INCIDENTAL TO MAIN DWELLINGHOUSEMerton 26/HOUSE/0236 · Householder
Feb 2026
200 m away - Approved
28, Graham Road, CR4 2HAErection of the side and rear single storey ground floor extension and including extension to the rear and side slope.Merton 26/HOUSE/0047 · Householder
Jan 2026
250 m away - Approved
37homes extended 2021–2025, typically adding 34 m²
66since energy certificates began (2008)
1in CR4 2GL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
214hours of spills in 2025 between them (typical neighbourhood: about 36)
136spill events counted
- Thames Water
Streatham & Balham Storm Relief Cinto Graveney51 spills, 92 hours in 2025
1.8 km away - Thames Water
Streatham Storm Reliefinto Graveney27 spills, 38 hours in 2025
1.1 km away - Thames Water
Streatham Storm Reliefinto Graveney11 spills, 29 hours in 2025
1.1 km away - Thames Water
Streatham Storm Reliefinto Graveney18 spills, 26 hours in 2025
1.1 km away - Thames Water
Streatham & Balham Storm Relief Binto Graveney18 spills, 21 hours in 2025
1.8 km away - Thames Water
Streatham Vale Storm Reliefinto River Graveney7 spills, 7 hours in 2025
1.2 km away - Thames Water
Cso At Longley Roadinto River Graveney2 spills, 2 hours in 2025
1.8 km away - Thames Water
N/Ainto Not Applicable2 spills, 1 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
36 planned, approved or being built and 1 running (26 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sainsburys Superstore, Merton High Street - Solar PanelsApproved, not yet built · 990 kW
Sept 2024
1.8 km away - Rooftop solar
JJ Foodservice, South Wimbledon - Solar PanelsPlanning application in · 350 kW
Sept 2024
2.0 km away - Rooftop solar
Grosvenor Wing, St Georges Hospital - Solar PanelsApproved, not yet built
Feb 2026
2.2 km away - Rooftop solar
Streatham Ice & Leisure, Streatham High Road - Solar Panels & ASHPApproved, not yet built · 330 kW
Mar 2024
2.3 km away - Rooftop solar
Morden Road, South Wimbledon - Solar pv panelsApproved, not yet built · 150 kW
Aug 2024
2.4 km away - Rooftop solar
Springfield University Hospital - Solar PanelsApproved, not yet built
May 2026
3.2 km away - Rooftop solar
Knights Hill - Solar PV equipmentApproved, not yet built · 180 kW
Sept 2023
4.0 km away - Rooftop solar
David Lloyd Club, Bushey Road - Solar PanelsApproved, not yet built · 800 kW
Sept 2023
4.3 km away - Rooftop solar
Sainsburys Supermarket, Trafalgar Way - Solar PanelsApproved, not yet built · 570 kW
Oct 2024
4.7 km away - Rooftop solar
Westcroft Leisure Centre, Westcroft Road - Solar PanelsApproved, not yet built · 270 kW
Oct 20244.9 km away
Road and street works within 1 km
14 permitted works running now or planned, 1 of them major.
- Major
Roper Way, MitchamUtility asset works · BT · Road closure
Oct 2026 to Oct 2026
250 m away - Standard
London Road, MitchamUtility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Contra-flow
Oct 2026 to Oct 2026
400 m away - Standard
Gorringe Park Avenue, MitchamHighway repair and maintenance works · LONDON BOROUGH OF MERTON · Give and take
Oct 2026 to Oct 2026
600 m away - Standard
St James' Road, MitchamUtility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Oct 2026 to Oct 2026
650 m away - Standard
Carlingford Gardens, MitchamUtility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · No carriageway incursion
Oct 2026 to Oct 2026
650 m away - Standard
Meopham Road, MitchamHighway repair and maintenance works · LONDON BOROUGH OF MERTON · Give and take
Oct 2026 to Oct 2026
850 m away - Minor
Eastfields Road, MitchamUtility asset works · BT · No carriageway incursion
Oct 2026 to Oct 2026
250 m away - Minor
Lavender Avenue, MitchamPermanent reinstatement · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Melrose Avenue, MitchamUtility asset works · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Oct 2026 to Nov 2026
650 m away
Major infrastructure projects within 30 km
- Decideddecided Sept 2014
11.4 km away - Pre-applicationapplication due March 2027
13.7 km away - Pre-applicationapplication due March 2028
13.7 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
15.4 km away - Pre-applicationapplication due December 2027
21.7 km away - Decideddecided May 2022
22.7 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
7.6 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
7.9 km away - TransportMay 2022
11.7 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
14.3 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
18.2 km away
6 new homes completedflats · Jul 2025
Jul 2025
1.5 km away
New homes6 new homes completedflats · Jul 2025
Jul 2025
1.3 km away Planning permissionJul 2025
1.5 km away New homes6 new homes completedflats · Jul 2025
Jul 2025
1000 m away New homes6 new homes completedflats · Jul 2025
Jul 2025
1.3 km away New homes7 new homes completedflats · Jun 2025
Jun 2025
200 m away New homes6 new homes completedflats · May 2025
May 2025
950 m away New homes32 new homes completed25 flats, 7 houses · Apr 2025
May 2025
750 m away Planning permissionApr 2025
1.6 km away New homes6 new homes completedflats · Mar 2025
Mar 2025
1.5 km away New homes5 new homes completedflats · Jan 2025
Jan 2025
1.5 km away New homes19 new homes completedflats · Dec 2024
Dec 2024
1.4 km away Planning permissionOct 2024
1.4 km away School closedSchool closed: Stanford Primary SchoolAcademy sponsor led, primary (closure)
Aug 2024
1.4 km away Planning permissionAug 2024
1.6 km away Planning permissionAug 2024
1.5 km away Planning permissionJul 2024
1.5 km away Planning permissionJun 2024
1.2 km away Planning permissionJun 2024
1.2 km away Planning permissionJun 2024
1.2 km away Planning permissionMay 2024
900 m away Planning permissionMar 2024
1.3 km away Planning permissionFeb 2024
1.5 km away Planning permissionDec 2023
1.5 km away Planning permissionAug 2023
1.9 km away Planning permissionPermission for 18 homesCanons Place Development Site North of 11 to 17 Madeira Road Madeira Road Madeira Road, Mitcham CR4 (full planning permission) Aug 2023
1.3 km away Planning permissionAug 2023
900 m away Planning permissionAug 2023
450 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 62 postcodes nearby had new homes completed in the last two years.
38, Graham Avenue, CR4 2HG
Single storey rear infill extension with Velux window
Merton 25/P3433 · Householder
Jan 2026
150 m away
Approved65, Streatham Road, CR4 2AHHip to Gable and Rear dormer loft conversion.Merton 26/P0096 · Householder
Jan 2026
200 m away Approved18, St James' Road, CR4 2DACONVERSION OF SINGLE FAMILY DWELLING HOUSE INTO TWO SELF-CONTAINED FLATS (1 X 3-BED, 1 X 1-BED/1-PERSON), INSTALLATION OF EXTERNAL REAR STAIRS (WITH 1.7M HIGH OBSCURED GLASS BALUSTRADE) TO ACCESS PRIVATE GARDEN, PROVISION OF REFUSE AND CYCLE STORAGE – NO EXTENSIONSMerton 25/P3062 · All Other · 3 homes proposed
Dec 2025
450 m away Approved65, Streatham Road, CR4 2AHAPPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED ERECTION OF A HIP TO GABLE, REAR DORMER ROOF EXTENSION AND FRONT ROOFLIGHTSMerton 25/P3059 · Householder
Oct 2025
200 m away Approved125, Unit 20 Mitcham Industrial Estate, Streatham Road, CR4 2APAPPLICATION FOR THE CHANGE OF USE FROM CLASS B2/B8 TO CLASS E(G)/B2/B8Merton 24/P3352 · All Other
Sept 2025
350 m away Approved10, Firtree Avenue, CR4 2JP10 Fir Tree Avenue - LoftMerton 25/P2471 · All Other
Aug 2025
350 m away Comment Issued10, Firtree Avenue, CR4 2JP6m single storey rear extensionMerton 25/P2470 · Prior Approval
Aug 2025
350 m away Comment Issued40, Graham Avenue, CR4 2HGSingle storey rear extension with pitched roof and Velux rooflights.Merton 25/P2394 · Prior Approval
Aug 2025
150 m away Comment Issued22, Sandy Lane, CR4 2HDAPPLICATION FOR PRIOR APPROVAL IN RESPECT OF THE PROPOSED ERECTION OF A SINGLE STOREY REAR EXTENSION WITH A DEPTH OF 5.5M, MAXIMUM HEIGHT OF 3.5M AND EAVES HEIGHT OF 3M.Merton 25/P2315 · Prior Approval
Aug 2025
100 m away Approved59, Lansdell Road, CR4 2JFAPPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED ERECTION OF HIP TO GABLE AND REAR ROOF EXTENSION AND INSERTION OF X3 ROOFLIGHTS TO FRONT ROOFSLOPE, FOLLOWING REMOVAL OF EXISTING CHIMNEY STACKS.Merton 25/P1769 · Householder
Jul 2025
400 m away Approved23, Marsh Avenue, CR4 2JNERECTION OF A TWO STOREY SIDE EXTENSION, FULL LENGTH REAR DORMER AND A HIP TO GABLEMerton 25/P1742 · Householder
Jun 2025
400 m away Application Received54, Edgehill Road, CR4 2HUCONVERSION OF SINGLE DWELLING HOUSE INTO 1 X 2 BED & 1 X 4 BED SELF-CONTAINED FLATS, INCORPORATING THE ERECTION OF A PART SINGLE AND PART TWO STOREY REAR EXTENSION, TWO STOREY SIDE EXTENSION AND REAR ROOF EXTENSIONS (HIP TO GABLE AND REAR DORMERS) WITH 3 X NEW ROOFLIGHTS TO THE FRONT ELEVATION.Merton 25/P1180 · All Other · 2 homes proposed
Jun 2025
300 m away Approved19, Ormerod Gardens, CR4 2LPAPPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED ERECTION OF A REAR DORMER ROOF EXTENSION AND 3 FRONT ROOFLIGHTSMerton 25/P1554 · Householder
May 2025
150 m away Comment Issued22, Lavender Avenue, CR4 3HHAPPLICATION TO DETERMINE WHETHER PRIOR APPROVAL IS REQUIRED IN RESPECT OF THE PROPOSED ERECTION OF A SINGLE STOREY REAR EXTENSION WITH THE FOLLOWING DIMENSIONS: EXTENDS BEYOND THE REAR WALL OF THE ORIGINAL DWELLINGHOUSE BY 5M, THE MAXIMUM HEIGHT OF THE ENLARGE DPART OF THE DWELLINGHOUSE WILL BE 3.35M THE HEIGHT OF THE EAVESOF THE ENLARGED PART OF THE DWELLINGHOUSE WILL BE 2.85M.Merton 25/P1382 · Prior Approval
May 2025
500 m away Refused11, Streatham Road, CR4 2ADAPPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED USE OF THE EXISTING DWELLING AS A CHILDREN'S CARE HOME FOR 1 RESIDENT, AND THE ERECTION OF A REFUSE STORES IN THE FRONT GARDENMerton 24/P3555 · Householder
Apr 2025
250 m away Application Received47, Lammas Avenue, CR4 2LYERECTION OF A 2 STOREY SIDE EXTENSION, 6 METRES REAR EXTENSION ALONG THE SIDE EXTENSION, AS WELL AS LOFT CONVERSION WITH REAR DORMER AND ROOF MODIFICATION. ERECTION OF A FRONT PORCH.Merton 25/P0622 · Householder
Apr 2025
400 m away Comment Issued50, Framfield Road, CR4 2ALAPPLICATION FOR PRIOR APPROVAL IN RESPECT OF THE PROPOSED ERECTION OF A SINGLE STOREY REAR EXTENSION WITH A DEPTH OF 6M, MAXIMUM HEIGHT OF 2.94M AND EAVES HEIGHT OF 2.94M.Merton 25/P1135 · Prior Approval
Apr 2025
400 m away Refused22, Lavender Avenue, CR4 3HHAPPLICATION FOR PRIOR APPROVAL IN RESPECT OF THE PROPOSED ERECTION OF A SINGLE STOREY REAR EXTENSION WITH A DEPTH OF 5M, MAXIMUM HEIGHT OF 3.45M AND EAVES HEIGHT OF 2.56M.Merton 25/P1091 · Prior Approval
Apr 2025
500 m away Comment Issued7, Eveline Road, CR4 3LFAPPLICATION FOR PRIOR APPROVAL IN RESPECT OF THE PROPOSED ERECTION OF A SINGLE STOREY REAR EXTENSION WITH A DEPTH OF 6M, MAXIMUM HEIGHT OF 3M AND EAVES HEIGHT OF 2.9M.Merton 25/P0906 · Prior Approval
Mar 2025
450 m away Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solarKimpton Park Way - Solar Pv PanelsPlanning application in · 180 kW
Aug 2023
5.1 km away Rooftop solarSelhurst Traincare Depot, Selhurst Road - Solar PanelsApproved, not yet built · 1 MW
Nov 2025
5.4 km away Running nearest: Beddington EfW (energy from waste, 3.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Stanley Road, MitchamUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
750 m away
Immediate - emergencyLondon Road, MitchamOptional permit (no fee) e.g. for traffic management etc · LONDON BOROUGH OF MERTON · Some carriageway incursion
Sept 2026 to Oct 2026
800 m away MinorAshbourne Road, MitchamUtility asset works · THAMES WATER · No carriageway incursion
Dec 2026 to Dec 2026
800 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Electric Lines · North London
decided Apr 2014
22.7 km away
Pre-applicationHeathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
23.6 km away DecidedRiverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
23.8 km away Decideddecided Nov 2025
24.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.