Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
84hours of spills in 2025 between them (typical neighbourhood: about 36)
13spill events counted
Anglian Water
Chelmsford Water Recycling Centreinto Blackwater Est &Trib R.Chelmer5 spills, 42 hours in 2025
800 m away
Anglian Water
Chelmsford Water Recycling Centreinto Blackwater Est &Trib R.Chelmer4 spills, 22 hours in 2025
800 m away
Anglian Water
Fambridge Rd - Maldoninto River Blackwater4 spills, 20 hours in 2025
Longfield Solar FarmGenerating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel
decided Jun 2023 9.9 km away
Decided
Rivenhall IWMF and Energy CentreGenerating Stations · Land at the former Rivenhall Airfield, off Coggeshall Road (A120), Braintree CO5 9DF
decided Dec 2024 12.3 km away
Pre-application
Dengie Peninsula Energy ParkGenerating Stations · Located north-east and south of the village of Bradwell-on-Sea and east of the village of Burnham-on-Crouch.
application due October 2027 18.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Heybridge: +20% over five years (2020 → 2025).
Council tax list: 70 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.0% in two years.