127new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.1%like-for-like prices in Silver End & Stisted, 2024 → 2025 (council +1.2%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
41 new homes completed9 flats, 32 houses · Mar 2025 – Jun 2026
Jun 2026
200 m away - New homes
38 new homes completedhouses · Nov 2025 – Jun 2026
Jun 2026
200 m away - New homes
16 new homes completedhouses · Nov 2024 – May 2026
May 2026
300 m away - New homes
5 new homes completedhouses · Mar 2026 – May 2026
May 2026
250 m away - New homes
15 new homes completedhouses · Jun 2025 – Aug 2025
Aug 2025
300 m away - New homes
9 new homes completedhouses · Apr 2025
Apr 2025
350 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
0homes extended 2021–2025
7since energy certificates began (2008)
0in CM8 3SR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
28 planned, approved or being built and 10 running (127 MW between them). Those within 5 km are on the map above.
- Solar farm
Park Road - Solar FarmApproved, not yet built · 23 MW
Dec 2023
1.4 km away - Anaerobic digestion
Wren Power and Pulp (Rivenhall Airfield)Being built · 2 MW
Apr 2016
1.5 km away - Solar farm
Cressing Farm, Witham Road - Solar FarmApproved, not yet built · 14 MW
Jun 2025
1.7 km away - Solar farm
Cressing East - Solar FarmApproved, not yet built · 25 MW
Mar 2025
2.6 km away - Battery storage
Verge By Ricksones School, Rickstones Road - Micro Energy StorageApproved, not yet built · 200 kW
Jul 2025
3.1 km away - Rooftop solar
Cego Limited, Crittall Road - Solar PanelsApproved, not yet built · 200 kW
Apr 2024
4.4 km away - Rooftop solar
Braintree Village, Charter Way - Solar PanelsApproved, not yet built · 360 kW
Jun 2025
4.8 km away - Solar farm
Colemans FarmPlanning application in · 300 kW
May 2019
4.9 km away - Battery storage
Braintree Road, Cressing - Battery StorageBeing built · 57 MW
Jan 2025
5.0 km away - Battery storage
Sewage Pumping Station, Worlds End Lane - Battery Energy StoragePlanning application in · 200 kW
Sept 2024
5.5 km away - Solar farm
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major, planned
Western Road, Silver EndHighway improvement works · ESSEX COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
500 m away - Major, planned
Boars Tye Road, Silver EndHighway improvement works · ESSEX COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
950 m away - Minor
Manors Way, Silver EndHighway improvement works · ESSEX COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
750 m away - Minor
Francis Way, Silver EndHighway improvement works · ESSEX COUNTY COUNCIL · Give and take
Nov 2026 to Nov 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Dec 2024
1.4 km away - Decideddecided Jan 2024
4.1 km away - Decided
Longfield Solar FarmGenerating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023
9.1 km away - Decided
Bramford to Twinstead Electric Lines · 29km linear route between the Bramford Substation,Suffolk and 1.5km south of Twinstead Tee, Essex decided Sept 2024
23.7 km away - Pre-application
Dengie Peninsula Energy ParkGenerating Stations · Located north-east and south of the village of Bradwell-on-Sea and east of the village of Burnham-on-Crouch. application due October 2027
27.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wren Power and Pulp (Rivenhall Airfield) (energy from waste, 1.5 km); Cressing Solar Farm (Phase 1) (solar farm, 2.0 km); Periwinkle Hall - Links Solar photovoltaic farm & Battery storage (solar farm, 2.1 km); Periwinkle Hall - Links Solar photovoltaic farm & Battery storage (battery storage, 2.1 km); Morrisons Witham - Solar Pv Panels (rooftop solar, 4.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.