Country England and Wales › Region East of England › Council Braintree › Neighbourhood Great Notley & Black Notley › Postcode CM77 7YL What's changing near CM77 7YL Within 2 km, around Great Notley & Black Notley in Braintree. Building, planning, schools, transport, prices and crime.
6 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.5% like-for-like prices in Great Notley & Black Notley, 2024 → 2025 (council +1.2%)
+15% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 34 m²
24 since energy certificates began (2008)
0 in CM77 7YL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 19 planned, approved or being built and 9 running (112 MW between them). Those within 5 km are on the map above.
Battery storage Slamseys Energy Storage Being built · 10 MW
Jan 2020 1000 m away Solar farm Felsted School Road - Solar Photovoltaic Farm & Battery storage Approved, not yet built · 50 MW
Sept 2023 1.1 km away Battery storage Felsted School Road - Solar Photovoltaic Farm & Battery storage Approved, not yet built
Sept 2023 1.1 km away Battery storage Pods Brook Road - Battery Distribution Approved, not yet built · 200 kW
Mar 2026 2.0 km away Energy from waste Chelmsford City Racecourse - Pyrolysis Plant Approved, not yet built
Sept 2021 2.1 km away Rooftop solar Antislip Antiwear Treads International, Swinbourne Drive - Solar Panels Approved, not yet built · 150 kW
Oct 2023 2.6 km away Battery storage Enterprise Drive, Springwood Drive - Batter Energy Storage Approved, not yet built · 200 kW
Jul 2025 3.1 km away Rooftop solar Braintree Village, Charter Way - Solar Panels Approved, not yet built · 360 kW
Jun 2025 3.3 km away Battery storage Braintree Road, Cressing - Battery Storage Being built · 57 MW
Jan 2025 3.8 km away Solar farm Cressing East - Solar Farm Approved, not yet built · 25 MW
Mar 2025 5.6 km away Road and street works within 1 km 3 permitted works running now or planned, 1 of them major.
Major, planned London Road, Black Notley Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 750 m away Standard Avenue West, Great Notley Utility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Give and take
Oct 2026 to Oct 2026 800 m away Minor Garden Village Way, Great Notley Highway improvement works · ESSEX COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 450 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Dec 2024 8.3 km away Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 8.6 km away Decided decided Jan 2024 10.9 km away Decided Bramford to Twinstead Electric Lines · 29km linear route between the Bramford Substation,Suffolk and 1.5km south of Twinstead Tee, Essex decided Sept 2024 28.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Drapers Farm Solar Park (solar farm, 1.9 km); Cressing Solar Farm (Phase 1) (solar farm, 5.6 km); Periwinkle Hall - Links Solar photovoltaic farm & Battery storage (solar farm, 6.8 km); Periwinkle Hall - Links Solar photovoltaic farm & Battery storage (battery storage, 6.8 km); Kentishes Solar Farm (solar farm, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.