Country England and Wales › Region East of England › Council Braintree › Neighbourhood Bocking › Postcode CM7 2TE What's changing near CM7 2TE Within 2 km, around Bocking in Braintree. Building, planning, schools, transport, prices and crime.
172 new homes completed within 2 km, last 2 years
5 homes given permission on brownfield sites since 2021
-5.0% like-for-like prices in Bocking, 2024 → 2025 (council +1.2%)
-10% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 10 new homes completed houses · Sep 2025 – Sep 2026
Sept 2026 1.8 km away New homes 20 new homes completed houses · Mar 2025 – Sep 2026
Sept 2026 1.9 km away New homes 14 new homes completed 2 flats, 12 houses · Dec 2025 – Aug 2026
Aug 2026 2.0 km away New homes 13 new homes completed houses · Dec 2024 – Aug 2026
Aug 2026 2.0 km away New homes 16 new homes completed 4 flats, 12 houses · Nov 2024 – Aug 2026
Aug 2026 1.8 km away New homes 7 new homes completed houses · May 2026 – Jul 2026
Jul 2026 1.9 km away New homes 10 new homes completed 6 flats, 4 houses · Nov 2025 – Jan 2026
Jan 2026 2.0 km away New homes 11 new homes completed flats · Dec 2025
Dec 2025 300 m away New homes 6 new homes completed flats · Jul 2025
Jul 2025 950 m away New homes 8 new homes completed houses · Feb 2025 – May 2025
May 2025 1.3 km away New homes 12 new homes completed 9 flats, 3 houses · Oct 2024 – Feb 2025
Feb 2025 1.8 km away New homes 8 new homes completed houses · Dec 2024
Dec 2024 1.8 km away 7 homes extended 2021–2025, typically adding 20 m²
19 since energy certificates began (2008)
2 in CM7 2TE itself
Extended certificate 2025 Extended certificate 2020 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 6 storm overflows within 2 km
9 hours of spills in 2025 between them (typical neighbourhood: about 36)
8 spill events counted
Anglian Water Braintree Water Recycling Centre into River Brain Nt 7 spills, 8 hours in 2025
950 m away Anglian Water Braintree Water Recycling Centre into River Brain Nt 1 spills, 1 hours in 2025
1.3 km away Anglian Water Notley Road Cso into The River Brain 0 spills, 0 hours in 2025
950 m away Anglian Water Rose Hill into River Brain 0 spills, 0 hours in 2025
1.3 km away Anglian Water Bradford Bridge Ps into Trib River Blackwater 0 spills, 0 hours in 2025
1.4 km away Anglian Water Rayne Terminal Pumping Station into Pods Brook 0 spills, 0 hours in 2025
1.9 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 18 planned, approved or being built and 8 running (119 MW between them). Those within 5 km are on the map above.
Rooftop solar Antislip Antiwear Treads International, Swinbourne Drive - Solar Panels Approved, not yet built · 150 kW
Oct 2023 600 m away Battery storage Enterprise Drive, Springwood Drive - Batter Energy Storage Approved, not yet built · 200 kW
Jul 2025 900 m away Battery storage Pods Brook Road - Battery Distribution Approved, not yet built · 200 kW
Mar 2026 900 m away Battery storage Braintree Road, Cressing - Battery Storage Being built · 57 MW
Jan 2025 2.0 km away Rooftop solar Braintree Village, Charter Way - Solar Panels Approved, not yet built · 360 kW
Jun 2025 2.1 km away Solar farm Felsted School Road - Solar Photovoltaic Farm & Battery storage Approved, not yet built · 50 MW
Sept 2023 3.6 km away Battery storage Felsted School Road - Solar Photovoltaic Farm & Battery storage Approved, not yet built
Sept 2023 3.6 km away Battery storage Slamseys Energy Storage Being built · 10 MW
Jan 2020 3.7 km away Solar farm Cressing East - Solar Farm Approved, not yet built · 25 MW
Mar 2025 4.6 km away Solar farm Kentish Farm 2 - Solar Farm Planning application in · 17 MW
Jul 2025 4.8 km away Road and street works within 1 km 11 permitted works running now or planned, 3 of them major.
Major, planned Coggeshall Road, Braintree Utility repair and maintenance works · ANGLIAN WATER · Road closure
Nov 2026 to Nov 2026 500 m away Major Currants Farm Road, Braintree Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 850 m away Major, planned Rayne Road, Braintree Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 1000 m away Minor Bunyan Road, Braintree Utility asset works · BT · Give and take
Oct 2026 to Oct 2026 250 m away Minor Pygot Place, Braintree Utility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away Minor Saunders Avenue, Braintree Utility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away Minor Panfield Lane, Braintree Highway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 300 m away Minor Rosemary Avenue, Braintree Utility repair and maintenance works · ANGLIAN WATER · Give and take
Oct 2026 to Oct 2026 350 m away Minor Springwood Drive, Braintree Highway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 850 m away Minor Bradford Street, Braintree
Major infrastructure projects within 30 km Decided decided Dec 2024 7.6 km away Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 10.9 km away Decided decided Jan 2024 11.0 km away Decided Bramford to Twinstead Electric Lines · 29km linear route between the Bramford Substation,Suffolk and 1.5km south of Twinstead Tee, Essex decided Sept 2024 25.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Drapers Farm Solar Park (solar farm, 4.3 km); Kentishes Solar Farm (solar farm, 4.8 km); Periwinkle Hall - Links Solar photovoltaic farm & Battery storage (solar farm, 5.7 km); Periwinkle Hall - Links Solar photovoltaic farm & Battery storage (battery storage, 5.7 km); Cressing Solar Farm (Phase 1) (solar farm, 5.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.