What's changing near CM3 4HY
Within 2 km, around Danbury & Bicknacre in Chelmsford. Building, planning, schools, transport, prices and crime.
3new homes completed within 2 km, last 2 years
10homes given permission on brownfield sites since 2021
+0.6%like-for-like prices in Danbury & Bicknacre, 2024 → 2025 (council +2.4%)
+12%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionOct 2025
1.5 km away - Planning permissionJul 2025
50 m away - Planning permissionOct 2024
2.0 km away - Planning permissionApr 2024
300 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 58 m²
23since energy certificates began (2008)
3in CM3 4HY itself
- Extendedcertificate 2023
- Extendedcertificate 2022
- Extendedcertificate 2020
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
19 planned, approved or being built and 1 running (25 MW between them). Those within 5 km are on the map above.
- Solar farm
St Cleres Hall Pit Solar ArrayApproved, not yet built · 25 MW
Oct 2021
2.9 km away - Solar farm
Prentice’s Farm- Solar FarmApproved, not yet built · 21 MW
Sept 2024
3.6 km away - Solar farm
Hill Farm Solar Park & Battery Storage (Hanningfield Green)Approved, not yet built · 37 MW
Jul 2022
5.7 km away - Battery storage
Hill Farm Solar Park & Battery Storage (Hanningfield Green)Approved, not yet built
Jul 2022
5.7 km away - Battery storage
Maldon HallApproved, not yet built · 40 MW
May 2019
5.8 km away - Battery storage
Visteon Engineering, Springfield Lyons Approach - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2025
6.6 km away - Rooftop solar
Sainsburys, White Hart Lane - Solar PanelsApproved, not yet built · 570 kW
Jul 2025
6.8 km away - Solar farm
Canon Barns Road Solar ParkApproved, not yet built · 8 MW
Jan 2022
6.8 km away - Solar farm
Canon Barns Road - Solar Photovoltaic Arrays & Battery StorageApproved, not yet built · 50 MW
Feb 2023
7.1 km away - Rooftop solar
Sub Zero And Wolf Limited, The Street - Solar PanelsApproved, not yet built · 200 kW
Oct 2022
7.3 km away - Solar farm
Road and street works within 1 km
10 permitted works running now or planned, 4 of them major.
- Major, planned
Hyde Lane, ChelmsfordUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
500 m away - Major
Hyde Lane, ChelmsfordUtility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026
600 m away - Major
Cherry Garden Lane, ChelmsfordUtility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026
650 m away - Major, planned
Hyde Lane, ChelmsfordUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
800 m away - Minor
Maldon Road, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
300 m away - Minor
London Road, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
650 m away - Minor
Maldon Road, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
700 m away - Minor
Main Road, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
750 m away - Minor
Mayes Lane, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
800 m away - Minor
Main Road, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Major infrastructure projects within 30 km
- Decided
Longfield Solar FarmGenerating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023
8.3 km away - Decideddecided Jan 2024
12.6 km away - Decideddecided Dec 2024
15.9 km away - Pre-application
Dengie Peninsula Energy ParkGenerating Stations · Located north-east and south of the village of Bradwell-on-Sea and east of the village of Burnham-on-Crouch. application due October 2027
22.6 km away - Decideddecided May 2022
25.7 km away - Decideddecided Mar 2025
28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.