What's changing near CM3 3AA
Within 2 km, around Boreham & Little Baddow in Chelmsford. Building, planning, schools, transport, prices and crime.
4new homes completed within 2 km, last 2 years
1homes given permission on brownfield sites since 2021
+5.7%like-for-like prices in Boreham & Little Baddow, 2024 → 2025 (council +2.4%)
+0%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionJan 2026
500 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 48 m²
6since energy certificates began (2008)
1in CM3 3AA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
24 planned, approved or being built and 3 running (6 MW between them). Those within 5 km are on the map above.
- Solar farm
LongfieldApproved, not yet built · 500 MW
Jun 2023
2.0 km away - Battery storage
LongfieldApproved, not yet built
Jun 2023
2.0 km away - Rooftop solar
Sainsburys, White Hart Lane - Solar PanelsApproved, not yet built · 570 kW
Jul 2025
3.0 km away - Battery storage
Visteon Engineering, Springfield Lyons Approach - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2025
3.3 km away - Solar farm
St Cleres Hall Pit Solar ArrayApproved, not yet built · 25 MW
Oct 2021
4.9 km away - Rooftop solar
Bridgemarsh Care Home, Main Road - Solar PanelsApproved, not yet built
Apr 2023
5.3 km away - Rooftop solar
Motus Trucks and Vans, Griggs Way - Solar PV PanelsApproved, not yet built · 280 kW
Feb 2023
6.1 km away - Battery storage
Spinks Lane - Micro Energy FacilityApproved, not yet built · 200 kW
May 2026
6.6 km away - Rooftop solar
Howbridge Junior School, Dengie Close - Solar PanelsApproved, not yet built · 160 kW
Aug 2023
6.7 km away - Battery storage
Verge Fronting, Westway - Micro Energy StorageApproved, not yet built · 200 kW
Feb 2026
8.1 km away - Rooftop solar
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Waltham Road, ChelmsfordUtility asset works · BT · Road closure
Mar 2027 to Mar 2027
450 m away - Major
Waltham Road, ChelmsfordUtility asset works · BT · Road closure
Mar 2027 to Mar 2027
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Longfield Solar FarmGenerating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023
2.0 km away - Decideddecided Jan 2024
9.9 km away - Decideddecided Dec 2024
11.7 km away - Decideddecided May 2022
26.5 km away - Pre-application
Dengie Peninsula Energy ParkGenerating Stations · Located north-east and south of the village of Bradwell-on-Sea and east of the village of Burnham-on-Crouch. application due October 2027
26.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons Witham - Solar Pv Panels (rooftop solar, 7.8 km); Cressing Solar Farm (Phase 1) (solar farm, 9.1 km); Roxwell Landfill Scheme (landfill gas, 10.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.