Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
Rolls Farm Barns, Hastingwood Road - Solar PanelsApproved, not yet built · 500 kW
Jan 2023 3.6 km away
Rooftop solar
Poundland Distribution Centre - Solar Photovoltaic SystemApproved, not yet built · 2 MW
Jul 2022 3.7 km away
Running nearest: Rye Meads Sewerage Treatment Works (anaerobic digestion, 7.4 km); Ratty's Lane Sustainable Energy Facility (Waste AD) (anaerobic digestion, 8.4 km); The Nurseries, Green Tye (anaerobic digestion, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
decided May 2018 29.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.