Country England and Wales › Region East of England › Council Harlow › Neighbourhood Church Langley › Postcode CM17 9QP What's changing near CM17 9QP Within 2 km, around Church Langley in Harlow. Building, planning, schools, transport, prices and crime.
283 new homes completed within 2 km, last 2 years
47 homes given permission on brownfield sites since 2021
+2.4% like-for-like prices in Church Langley, 2024 → 2025 (council +2.6%)
+13% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 32 new homes completed houses · Jun 2026 – Oct 2026
planned Oct 2026 1.2 km away New homes 17 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.2 km away New homes 6 new homes completed houses · Feb 2026
Feb 2026 1.3 km away New homes 60 new homes completed flats · Feb 2026
Feb 2026 1.8 km away New homes 56 new homes completed flats · Feb 2026
Feb 2026 1.8 km away New homes 9 new homes completed houses · Jun 2025 – Feb 2026
Feb 2026 1.4 km away New homes 8 new homes completed flats · Oct 2025
Oct 2025 2.0 km away New homes 14 new homes completed 8 flats, 6 houses · Jul 2025 – Sep 2025
Sept 2025 1.2 km away New homes 14 new homes completed 10 flats, 4 houses · Jul 2025 – Aug 2025
Aug 2025 1.1 km away New homes 10 new homes completed houses · Jul 2025
Aug 2025 1.2 km away New homes 12 new homes completed houses · Nov 2024 – Jun 2025
Jun 2025 1.3 km away New homes 20 new homes completed 8 flats, 12 houses · Nov 2024 – May 2025
May 2025 1.3 km away 15 homes extended 2021–2025, typically adding 21 m²
28 since energy certificates began (2008)
1 in CM17 9QP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 19 planned, approved or being built and 3 running (7 MW between them). Those within 5 km are on the map above.
Battery storage West Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jun 2026 2.2 km away Rooftop solar Edinburgh Way - Solar Panels Approved, not yet built · 200 kW
Mar 2026 2.3 km away Rooftop solar Harlow Leisurezone, Second Avenue - Solar panels Approved, not yet built · 700 kW
Apr 2024 2.3 km away Rooftop solar Calder House, Central Road - Solar Panels Approved, not yet built · 360 kW
Dec 2022 2.4 km away Solar farm Gates Of Harlow, Edinburgh Way - Solar Panels Approved, not yet built · 160 kW
May 2022 2.5 km away Rooftop solar Rolls Farm Barns, Hastingwood Road - Solar Panels Approved, not yet built · 500 kW
Jan 2023 3.1 km away Rooftop solar Icon Harlow, Unit C - Solar Panels Approved, not yet built · 570 kW
Jun 2023 4.2 km away Rooftop solar Icon Harlow, Unit B - Solar Panels Approved, not yet built · 800 kW
Jun 2023 4.2 km away Rooftop solar Icon Industrial Estate - Solar Panels Approved, not yet built · 500 kW
Jun 2023 4.3 km away Rooftop solar Poundland Distribution Centre - Solar Photovoltaic System Approved, not yet built · 2 MW
Jul 2022 4.4 km away Rooftop solar Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major Momples Road, Harlow Highway improvement works · ESSEX COUNTY COUNCIL · Give and take
Oct 2026 to Feb 2027 1000 m away Minor A414 Between Southern Town Boundary And Harlow Mill Roundabout, Harlow Highway improvement works · ESSEX COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026 550 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 19.1 km away Decided decided Feb 2017 20.3 km away Decided decided Apr 2014 21.9 km away Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 28.4 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 29.0 km away Decided decided Nov 2025 29.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Rye Meads Sewerage Treatment Works (anaerobic digestion, 8.1 km); Ratty's Lane Sustainable Energy Facility (Waste AD) (anaerobic digestion, 9.2 km); The Nurseries, Green Tye (anaerobic digestion, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.