Country England and Wales › Region East of England › Council Epping Forest › Neighbourhood Epping North › Postcode CM16 4BA What's changing near CM16 4BA Within 2 km, around Epping North in Epping Forest. Building, planning, schools, transport, prices and crime.
28 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.5% like-for-like prices in Epping North, 2024 → 2025 (council -0.3%)
-5% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
30 homes extended 2021–2025, typically adding 46 m²
59 since energy certificates began (2008)
0 in CM16 4BA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 1 running (2 MW between them). Those within 5 km are on the map above.
Solar farm Thrift Solar Farm and BESS Approved, not yet built · 30 MW
Dec 2025 4.2 km away Battery storage Thrift Solar Farm and BESS Approved, not yet built · 30 MW
Dec 2025 4.2 km away Rooftop solar Aerzen House, Langston Road - Solar Panels Approved, not yet built · 150 kW
Jan 2025 5.6 km away Solar farm Nickerlands Solar Farm - Solar Farm Approved, not yet built · 25 MW
Feb 2025 6.2 km away Rooftop solar Icon Harlow, Third Avenue - Solar Photovoltaic Panels Approved, not yet built · 700 kW
Jun 2023 7.4 km away Rooftop solar Rolls Farm Barns, Hastingwood Road - Solar Panels Approved, not yet built · 500 kW
Jan 2023 7.4 km away Rooftop solar Icon Industrial Estate - Solar Panels Approved, not yet built · 500 kW
Jun 2023 7.5 km away Rooftop solar Gsk Icon Harlow - Solar Photovoltaic Panels Approved, not yet built · 580 kW
Nov 2023 7.7 km away Rooftop solar Icon Harlow, Unit C - Solar Panels Approved, not yet built · 570 kW
Jun 2023 7.8 km away Rooftop solar Icon Harlow, Unit B - Solar Panels Approved, not yet built · 800 kW
Jun 2023 7.8 km away Rooftop solar Road and street works within 1 km 4 permitted works running now or planned, 2 of them major.
Major Sunnyside Road, Epping Utility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026 950 m away Major Bridge Hill, Epping Utility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026 950 m away Minor Hemnall Street, Epping Highway improvement works · ESSEX COUNTY COUNCIL · Temp obstruction 15 minute delay
Oct 2026 to Oct 2026 350 m away Minor Albany Court, Epping Highway repair and maintenance works · ESSEX COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2017 13.4 km away Decided decided May 2022 14.0 km away Decided decided Apr 2014 14.8 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 21.5 km away Decided decided Nov 2025 21.6 km away Decided Silvertown Tunnel Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018 22.7 km away Pre-application Transport schemes within 20 km DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.