What's changing near CM15 9DA
Within 2 km, around Brentwood North in Brentwood. Building, planning, schools, transport, prices and crime.
113new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.1%like-for-like prices in Brentwood North, 2024 → 2025 (council +3.2%)
+8%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completed3 flats, 7 houses · Nov 2025 – Mar 2026
Mar 2026
1.2 km away - New homes
60 new homes completedflats · Jun 2025 – Dec 2025
Dec 2025
800 m away - New homes
5 new homes completedhouses · Apr 2025 – Dec 2025
Dec 2025
1.3 km away - New homes
5 new homes completedflats · Nov 2025
Nov 2025
1.3 km away - New homes
9 new homes completedflats · Feb 2025
Feb 2025
1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
25homes extended 2021–2025, typically adding 31 m²
38since energy certificates began (2008)
0in CM15 9DA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
16 planned, approved or being built and 12 running (258 MW between them). Those within 5 km are on the map above.
- Solar farm
Billericay Solar Farm - Solar FarmApproved, not yet built · 15 MW
Apr 2025
2.2 km away - Rooftop solar
The Marillac, Eagle Way - Solar PV PanelsApproved, not yet built · 170 kW
Jun 2025
3.0 km away - Battery storage
Brentwood nergy Storage SystemApproved, not yet built · 50 MW
May 2021
4.4 km away - Rooftop solar
Peri Limited, Greenways - Solar PhotovoltaicsApproved, not yet built · 460 kW
Dec 2022
5.1 km away - Rooftop solar
Central Park Leisure - PV SystemApproved, not yet built · 370 kW
Nov 2024
5.7 km away - Rooftop solar
Romford Halal Meats, Folkes Lane - Solar PanelsApproved, not yet built · 250 kW
Dec 2022
6.0 km away - Solar farm
Great Cowbridge Grange Farm, London Road - Solar FarmApproved, not yet built · 10 MW
May 2025
6.2 km away - Rooftop solar
Langford Bridge Farm, Ongar Road - Solar PanelsApproved, not yet built · 160 kW
Feb 2025
7.4 km away - Battery storage
Warley Energy Hub, Ockenden - Battery Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025
7.4 km away - Rooftop solar
David Lloyd Leisure, Gidea Park - Solar PanelsApproved, not yet built · 380 kW
Jul 2023
7.6 km away
Road and street works within 1 km
3 permitted works running now or planned.
- Standard
Sawyers Grove, BrentwoodHighway improvement works · ESSEX COUNTY COUNCIL · Give and take
Oct 2026 to Nov 2026
300 m away - Standard
Ongar Road, BrentwoodUtility asset works · Electricity Network Company Limited · Two-way signals
Feb 2027 to Feb 2027
400 m away - Minor
Highwood Close, BrentwoodUtility repair and maintenance works · ESSEX AND SUFFOLK WATER · No carriageway incursion
Oct 2026 to Oct 2026
800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
3.6 km away - Decideddecided Mar 2025
14.2 km away - Decideddecided Nov 2025
16.8 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
17.0 km away - Decideddecided Feb 2022
19.3 km away - Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019
19.6 km away - Decided
Transport schemes within 20 km
Running nearest: Hutton Battery Storage (Lower Road) (battery storage, 4.0 km); Crouch Solar Farm (solar farm, 6.6 km); Crouch Solar Farm (battery storage, 6.6 km); Cranham Golf Course Solar Park (solar farm, 7.7 km); Clay Tye Farm Phase 1 - Storage Facility (battery storage, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.