Country England and Wales › Region East of England › Council Brentwood › Neighbourhood Kelvedon Hatch & Doddinghurst › Postcode CM15 0LE What's changing near CM15 0LE Within 2 km, around Kelvedon Hatch & Doddinghurst in Brentwood. Building, planning, schools, transport, prices and crime.
6 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.0% like-for-like prices in Kelvedon Hatch & Doddinghurst, 2024 → 2025 (council +3.2%)
-1% recorded crime, last 12 months vs the 12 before
On the map
New homes Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
0 homes extended 2021–2025
0 since energy certificates began (2008)
0 in CM15 0LE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 9 planned, approved or being built and 3 running (13 MW between them). Those within 5 km are on the map above.
Rooftop solar Langford Bridge Farm, Ongar Road - Solar Panels Approved, not yet built · 160 kW
Feb 2025 1.8 km away Solar farm Nickerlands Solar Farm - Solar Farm Approved, not yet built · 25 MW
Feb 2025 5.9 km away Solar farm Billericay Solar Farm - Solar Farm Approved, not yet built · 15 MW
Apr 2025 6.7 km away Battery storage Brentwood nergy Storage System Approved, not yet built · 50 MW
May 2021 7.3 km away Solar farm Thrift Solar Farm and BESS Approved, not yet built · 30 MW
Dec 2025 7.9 km away Battery storage Thrift Solar Farm and BESS Approved, not yet built · 30 MW
Dec 2025 7.9 km away Rooftop solar The Marillac, Eagle Way - Solar PV Panels Approved, not yet built · 170 kW
Jun 2025 9.3 km away Rooftop solar Central Park Leisure - PV System Approved, not yet built · 370 kW
Nov 2024 9.4 km away Solar farm Great Cowbridge Grange Farm, London Road - Solar Farm Approved, not yet built · 10 MW
May 2025 9.8 km away Running nearest: Ongar Landfill Scheme 2 (landfill gas, 2.3 km); Ongar Landfill Scheme (landfill gas, 2.3 km); Hutton Battery Storage (Lower Road) (battery storage, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major Ongar Road, Stondon Massey Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027 450 m away Major, planned Chivers Road, Stondon Massey Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 850 m away Major Chivers Road, Stondon Massey Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 850 m away Minor Nine Ashes Road, Stondon Massey Utility repair and maintenance works · AFFINITY WATER - C · Two-way signals
Nov 2026 to Nov 2026 700 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 8.1 km away Decided decided Mar 2025 20.6 km away Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 21.3 km away Decided decided Nov 2025 21.6 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 21.7 km away Decided decided Feb 2017 23.4 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.