Country England and Wales › Region East of England › Council Chelmsford › Neighbourhood South Broomfield › Postcode CM1 4AW What's changing near CM1 4AW Within 2 km, around South Broomfield in Chelmsford. Building, planning, schools, transport, prices and crime.
1 new homes completed within 2 km, last 2 years
108 homes given permission on brownfield sites since 2021
-0.6% like-for-like prices in South Broomfield, 2024 → 2025 (council +2.4%)
+7% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first Planning permission May 2026 700 m away Planning permission Nov 2025 1.7 km away Planning permission Dec 2024 600 m away Planning permission Nov 2024 1.3 km away Planning permission Oct 2024 1.9 km away Planning permission May 2024 350 m away Planning permission Aug 2021 50 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
21 homes extended 2021–2025, typically adding 39 m²
31 since energy certificates began (2008)
0 in CM1 4AW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
1 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 11 planned, approved or being built and 1 running (1 MW between them). Those within 5 km are on the map above.
Rooftop solar Bridgemarsh Care Home, Main Road - Solar Panels Approved, not yet built
Apr 2023 850 m away Rooftop solar Sainsburys, White Hart Lane - Solar Panels Approved, not yet built · 570 kW
Jul 2025 3.2 km away Battery storage Visteon Engineering, Springfield Lyons Approach - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2025 3.2 km away Battery storage Sewage Treatment Works, Lawford Lane - Micro Energy Storage Planning application in · 200 kW
Aug 2024 3.8 km away Battery storage Verge Fronting, Westway - Micro Energy Storage Approved, not yet built · 200 kW
Feb 2026 3.8 km away Rooftop solar Robjohns Road - Solar Photovoltaic Panels Approved, not yet built · 180 kW
Oct 2021 4.0 km away Battery storage Robjohns Road - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2026 4.3 km away Solar farm Longfield Approved, not yet built · 500 MW
Jun 2023 6.0 km away Battery storage Longfield Approved, not yet built
Jun 2023 6.0 km away Solar farm St Cleres Hall Pit Solar Array Approved, not yet built · 25 MW
Oct 2021 7.0 km away Energy from waste Road and street works within 1 km 3 permitted works running now or planned, 3 of them major.
Major, planned Patching Hall Lane, Chelmsford Utility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Road closure
Oct 2026 to Oct 2026 500 m away Major, planned Patching Hall Lane, Chelmsford Utility asset works · ESSEX AND SUFFOLK WATER · Road closure
Dec 2026 to Dec 2026 550 m away Major Patching Hall Lane, Chelmsford Utility asset works · ESSEX AND SUFFOLK WATER · Road closure
Dec 2026 to Dec 2026 550 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 6.0 km away Decided decided Jan 2024 15.2 km away Decided decided Dec 2024 16.2 km away Decided decided May 2022 21.8 km away Decided decided Mar 2025 29.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.