Country England and Wales › Region East of England › Council Brentwood › Neighbourhood Brook Street & Pilgrim's Hatch › Postcode CM14 5NT What's changing near CM14 5NT Within 2 km, around Brook Street & Pilgrim's Hatch in Brentwood. Building, planning, schools, transport, prices and crime.
106 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.2% like-for-like prices in Brook Street & Pilgrim's Hatch, 2024 → 2025 (council +3.2%)
+9% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 8 new homes completed houses · Jul 2026 – Aug 2026
Aug 2026 700 m away New homes 60 new homes completed flats · Jun 2025 – Dec 2025
Dec 2025 1.8 km away New homes 5 new homes completed houses · Apr 2025 – Dec 2025
Dec 2025 1.3 km away New homes 5 new homes completed flats · Nov 2025
Nov 2025 1.9 km away New homes 6 new homes completed flats · Dec 2024
Dec 2024 1.7 km away New homes 5 new homes completed houses · Oct 2024
Oct 2024 650 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
24 homes extended 2021–2025, typically adding 34 m²
40 since energy certificates began (2008)
2 in CM14 5NT itself
Extended certificate 2023 Extended certificate 2021 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
192 hours of spills in 2025 between them (typical neighbourhood: about 36)
17 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 12 running (258 MW between them). Those within 5 km are on the map above.
Rooftop solar The Marillac, Eagle Way - Solar PV Panels Approved, not yet built · 170 kW
Jun 2025 2.4 km away Rooftop solar Central Park Leisure - PV System Approved, not yet built · 370 kW
Nov 2024 3.5 km away Rooftop solar Peri Limited, Greenways - Solar Photovoltaics Approved, not yet built · 460 kW
Dec 2022 4.0 km away Rooftop solar Romford Halal Meats, Folkes Lane - Solar Panels Approved, not yet built · 250 kW
Dec 2022 4.1 km away Solar farm Billericay Solar Farm - Solar Farm Approved, not yet built · 15 MW
Apr 2025 4.5 km away Rooftop solar David Lloyd Leisure, Gidea Park - Solar Panels Approved, not yet built · 380 kW
Jul 2023 5.1 km away Battery storage Warley Energy Hub, Ockenden - Battery Energy Storage System Approved, not yet built · 200 kW
Aug 2025 6.2 km away Battery storage Brentwood nergy Storage System Approved, not yet built · 50 MW
May 2021 6.7 km away Battery storage Clay Tye Farm - Energy Storage Facility Planning application in · 200 MW
May 2026 7.0 km away Rooftop solar Liberty Shopping Centre, Western Road - Solar Panels Approved, not yet built · 460 kW
Mar 2024 7.4 km away Road and street works within 1 km 7 permitted works running now or planned, 5 of them major.
Major, planned London Road, Brentwood Highway improvement works · ESSEX COUNTY COUNCIL · Multi-way signals
Nov 2026 to Apr 2027 200 m away Major, planned London Road, Brentwood Highway improvement works · ESSEX COUNTY COUNCIL · Multi-way signals
Nov 2026 to Apr 2027 350 m away Major, planned Brook Street, Brentwood Highway improvement works · ESSEX COUNTY COUNCIL · Multi-way signals
Nov 2026 to Apr 2027 600 m away Major, planned Brook Street, Brentwood Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Nov 2026 to Apr 2027 750 m away Major, planned Brook Street, Brentwood Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Nov 2026 to Apr 2027 850 m away Standard Wigley Bush Lane, South Weald Works for road purposes · NATIONAL HIGHWAYS · Two-way signals
Nov 2026 to Dec 2026 250 m away Minor Weald Park Way, South Weald Utility repair and maintenance works · BT · Two-way signals
Nov 2026 to Nov 2026 800 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 1.3 km away Decided decided Mar 2025 13.4 km away Decided decided Nov 2025 14.5 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 14.7 km away Decided decided Feb 2022 18.6 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 18.8 km away Decided Transport schemes within 20 km Running nearest: Cranham Golf Course Solar Park (solar farm, 6.1 km); Hutton Battery Storage (Lower Road) (battery storage, 6.3 km); Bower Park Academy - Solar Photovoltaic Panels (rooftop solar, 6.5 km); Clay Tye Farm Phase 1 - Storage Facility (battery storage, 7.0 km); Clay Tye Farm Phase 2 - Storage Facility (battery storage, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.