Country England and Wales › Region East of England › Council Brentwood › Neighbourhood Shenfield & Hutton Mount › Postcode CM13 2NW What's changing near CM13 2NW Within 2 km, around Shenfield & Hutton Mount in Brentwood. Building, planning, schools, transport, prices and crime.
41 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+8.1% like-for-like prices in Shenfield & Hutton Mount, 2024 → 2025 (council +3.2%)
-22% recorded crime, last 12 months vs the 12 before
On the map
New homes School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed 5 flats, 1 houses · Jan 2026 – May 2026
May 2026 700 m away New homes 10 new homes completed 3 flats, 7 houses · Nov 2025 – Mar 2026
Mar 2026 900 m away New homes 9 new homes completed flats · Feb 2025
Feb 2025 300 m away School closed School closed: Herington House School Other independent school, other independent school (closure)
Jul 2020 400 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
33 homes extended 2021–2025, typically adding 62 m²
60 since energy certificates began (2008)
1 in CM13 2NW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
4 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 21 planned, approved or being built and 13 running (288 MW between them). Those within 5 km are on the map above.
Solar farm Billericay Solar Farm - Solar Farm Approved, not yet built · 15 MW
Apr 2025 500 m away Battery storage Brentwood nergy Storage System Approved, not yet built · 50 MW
May 2021 2.6 km away Rooftop solar The Marillac, Eagle Way - Solar PV Panels Approved, not yet built · 170 kW
Jun 2025 3.5 km away Solar farm Great Cowbridge Grange Farm, London Road - Solar Farm Approved, not yet built · 10 MW
May 2025 4.3 km away Rooftop solar Peri Limited, Greenways - Solar Photovoltaics Approved, not yet built · 460 kW
Dec 2022 5.6 km away Rooftop solar Romford Halal Meats, Folkes Lane - Solar Panels Approved, not yet built · 250 kW
Dec 2022 6.9 km away Rooftop solar Central Park Leisure - PV System Approved, not yet built · 370 kW
Nov 2024 7.5 km away Battery storage Warley Energy Hub, Ockenden - Battery Energy Storage System Approved, not yet built · 200 kW
Aug 2025 7.7 km away Battery storage Lower Dunton Road - Battery Energy Storage System Planning application in · 368 MW
Oct 2024 8.0 km away Solar farm Outwood Farm (Phase 2) Approved, not yet built · 7 MW
Dec 2014 8.1 km away Rooftop solar Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 5.3 km away Decided decided Mar 2025 14.0 km away Decided decided Nov 2025 18.1 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 18.3 km away Decided decided Feb 2022 18.8 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 19.2 km away Decided Transport schemes within 20 km Running nearest: Hutton Battery Storage (Lower Road) (battery storage, 2.2 km); Crouch Solar Farm (solar farm, 5.3 km); Crouch Solar Farm (battery storage, 5.3 km); Ford Research And Engineering Centre, Dunton - Solar Farm (solar farm, 7.3 km); Lower Dunton Road Battery Storage Facility (battery storage, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.