Country England and Wales › Region East of England › Council Brentwood › Neighbourhood Shenfield & Hutton Mount › Postcode CM13 1YS What's changing near CM13 1YS Within 2 km, around Shenfield & Hutton Mount in Brentwood. Building, planning, schools, transport, prices and crime.
35 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+8.1% like-for-like prices in Shenfield & Hutton Mount, 2024 → 2025 (council +3.2%)
-22% recorded crime, last 12 months vs the 12 before
On the map
New homes School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed 5 flats, 1 houses · Jan 2026 – May 2026
May 2026 400 m away New homes 10 new homes completed 3 flats, 7 houses · Nov 2025 – Mar 2026
Mar 2026 1.6 km away New homes 9 new homes completed flats · Feb 2025
Feb 2025 900 m away School closed School closed: Herington House School Other independent school, other independent school (closure)
Jul 2020 600 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
21 homes extended 2021–2025, typically adding 39 m²
42 since energy certificates began (2008)
0 in CM13 1YS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 13 running (288 MW between them). Those within 5 km are on the map above.
Solar farm Billericay Solar Farm - Solar Farm Approved, not yet built · 15 MW
Apr 2025 600 m away Battery storage Brentwood nergy Storage System Approved, not yet built · 50 MW
May 2021 1.7 km away Solar farm Great Cowbridge Grange Farm, London Road - Solar Farm Approved, not yet built · 10 MW
May 2025 3.6 km away Rooftop solar The Marillac, Eagle Way - Solar PV Panels Approved, not yet built · 170 kW
Jun 2025 4.5 km away Rooftop solar Peri Limited, Greenways - Solar Photovoltaics Approved, not yet built · 460 kW
Dec 2022 6.4 km away Solar farm Outwood Farm (Phase 2) Approved, not yet built · 7 MW
Dec 2014 7.5 km away Rooftop solar Romford Halal Meats, Folkes Lane - Solar Panels Approved, not yet built · 250 kW
Dec 2022 7.8 km away Solar farm Barleylands Solar Farm Approved, not yet built · 17 MW
Oct 2024 8.1 km away Battery storage Barleylands Solar Farm Approved, not yet built
Oct 2024 8.1 km away Battery storage Lower Dunton Road - Battery Energy Storage System Planning application in · 368 MW
Oct 2024 8.2 km away Rooftop solar Langford Bridge Farm, Ongar Road - Solar Panels
Road and street works within 1 km 5 permitted works running now or planned, 3 of them major.
Major Highview Crescent, Hutton Utility repair and maintenance works · ESSEX AND SUFFOLK WATER · Road closure
Oct 2026 to Oct 2026 300 m away Major Byron Road, Hutton Utility asset works · BT · Road closure
Oct 2026 to Oct 2026 650 m away Major Kingsley Road, Hutton Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 900 m away Standard Chelmsford Road, Shenfield New service connection · ESSEX AND SUFFOLK WATER · Two-way signals
Oct 2026 to Oct 2026 1000 m away Minor Brookfield Close, Hutton Remedial works · Electricity Network Company Limited · Give and take
Oct 2026 to Oct 2026 600 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 6.2 km away Decided decided Mar 2025 14.5 km away Decided decided Nov 2025 19.0 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 19.2 km away Decided decided Feb 2022 19.3 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 19.6 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hutton Battery Storage (Lower Road) (battery storage, 1.3 km); Crouch Solar Farm (solar farm, 5.4 km); Crouch Solar Farm (battery storage, 5.4 km); Ford Research And Engineering Centre, Dunton - Solar Farm (solar farm, 7.3 km); Outwood Farm (Phase 1) (solar farm, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.