Country England and Wales › Region East of England › Council Brentwood › Neighbourhood Ingatestone & Mountnessing › Postcode CM13 1UL What's changing near CM13 1UL Within 2 km, around Ingatestone & Mountnessing in Brentwood. Building, planning, schools, transport, prices and crime.
98 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.0% like-for-like prices in Ingatestone & Mountnessing, 2024 → 2025 (council +3.2%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 24 new homes completed 15 flats, 9 houses · Dec 2025 – Oct 2026
planned Oct 2026 1.2 km away New homes 8 new homes completed flats · Oct 2025 – May 2026
May 2026 900 m away New homes 9 new homes completed flats · Mar 2025 – Mar 2026
Mar 2026 950 m away New homes 11 new homes completed 4 flats, 7 houses · Jun 2025 – Mar 2026
Mar 2026 850 m away New homes 8 new homes completed flats · Feb 2026
Feb 2026 900 m away New homes 8 new homes completed flats · Nov 2025
Nov 2025 900 m away New homes 6 new homes completed flats · Jul 2025
Jul 2025 750 m away New homes 9 new homes completed 5 flats, 4 houses · Feb 2025 – Jul 2025
Jul 2025 750 m away New homes 5 new homes completed houses · Feb 2025 – May 2025
May 2025 800 m away New homes 8 new homes completed houses · Nov 2024 – May 2025
May 2025 800 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
2 homes extended 2021–2025, typically adding 64 m²
2 since energy certificates began (2008)
1 in CM13 1UL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 3 storm overflows within 2 km
233 hours of spills in 2025 between them (typical neighbourhood: about 36)
43 spill events counted
Anglian Water Shenfield Stw No 2 Ps into Tributary Of River Wid 32 spills, 171 hours in 2025
1.8 km away Anglian Water So At Shenfield Sewer into River Wid 11 spills, 62 hours in 2025
1.5 km away Anglian Water Shenfield And Hutton Wrc into River Wid 0 spills, 0 hours in 2025
1.7 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 10 running (186 MW between them). Those within 5 km are on the map above.
Battery storage Brentwood nergy Storage System Approved, not yet built · 50 MW
May 2021 1.6 km away Solar farm Great Cowbridge Grange Farm, London Road - Solar Farm Approved, not yet built · 10 MW
May 2025 3.0 km away Solar farm Billericay Solar Farm - Solar Farm Approved, not yet built · 15 MW
Apr 2025 3.7 km away Solar farm Outwood Farm (Phase 2) Approved, not yet built · 7 MW
Dec 2014 6.0 km away Solar farm Barleylands Solar Farm Approved, not yet built · 17 MW
Oct 2024 7.5 km away Battery storage Barleylands Solar Farm Approved, not yet built
Oct 2024 7.5 km away Rooftop solar The Marillac, Eagle Way - Solar PV Panels Approved, not yet built · 170 kW
Jun 2025 7.6 km away Rooftop solar Langford Bridge Farm, Ongar Road - Solar Panels Approved, not yet built · 160 kW
Feb 2025 9.0 km away Battery storage Miles Gray Road, Steeple View - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2026 9.2 km away Battery storage Robjohns Road - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2026 9.2 km away Rooftop solar Robjohns Road - Solar Photovoltaic Panels
Road and street works within 1 km 2 permitted works running now or planned, 2 of them major.
Major, planned Burnthouse Lane, Mountnessing Works for Rail Purposes · NETWORK RAIL · Road closure
Nov 2026 to Nov 2026 750 m away Major Burnthouse Lane, Mountnessing Works for Rail Purposes · NETWORK RAIL · Road closure
Nov 2026 to Nov 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 9.3 km away Decided decided Mar 2025 16.7 km away Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 18.7 km away Decided decided Feb 2022 21.1 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 21.6 km away Decided decided Nov 2025 22.2 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hutton Battery Storage (Lower Road) (battery storage, 2.0 km); Outwood Farm (Phase 1) (solar farm, 6.0 km); Crouch Solar Farm (solar farm, 7.0 km); Crouch Solar Farm (battery storage, 7.0 km); Crays Hall Farm - Solar Arrays (solar farm, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.