What's changing near CM13 1DN
Within 2 km, around Hutton in Brentwood. Building, planning, schools, transport, prices and crime.
15new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.5%like-for-like prices in Hutton, 2024 → 2025 (council +3.2%)
-19%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completed5 flats, 1 houses · Jan 2026 – May 2026
May 2026
1.6 km away - School closed
School closed: Herington House SchoolOther independent school, other independent school (closure)
Jul 2020
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 38 m²
37since energy certificates began (2008)
1in CM13 1DN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
62hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
- Anglian Water
So At Shenfield Sewerinto River Wid11 spills, 62 hours in 2025
900 m away - Anglian Water
Shenfield And Hutton Wrcinto River Wid0 spills, 0 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
17 planned, approved or being built and 11 running (189 MW between them). Those within 5 km are on the map above.
- Battery storage
Brentwood nergy Storage SystemApproved, not yet built · 50 MW
May 2021
600 m away - Solar farm
Billericay Solar Farm - Solar FarmApproved, not yet built · 15 MW
Apr 2025
1.8 km away - Solar farm
Great Cowbridge Grange Farm, London Road - Solar FarmApproved, not yet built · 10 MW
May 2025
2.6 km away - Rooftop solar
The Marillac, Eagle Way - Solar PV PanelsApproved, not yet built · 170 kW
Jun 2025
5.4 km away - Solar farm
Outwood Farm (Phase 2)Approved, not yet built · 7 MW
Dec 2014
6.4 km away - Solar farm
Barleylands Solar FarmApproved, not yet built · 17 MW
Oct 2024
7.2 km away - Battery storage
Barleylands Solar FarmApproved, not yet built
Oct 2024
7.2 km away - Rooftop solar
Peri Limited, Greenways - Solar PhotovoltaicsApproved, not yet built · 460 kW
Dec 2022
7.2 km away - Battery storage
Lower Dunton Road - Battery Energy Storage SystemPlanning application in · 368 MW
Oct 2024
8.0 km away - Battery storage
Miles Gray Road, Steeple View - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2026
8.6 km away - Rooftop solar
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major
Rayleigh Road, HuttonRemedial works · ESSEX COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Major
Highview Crescent, HuttonUtility repair and maintenance works · ESSEX AND SUFFOLK WATER · Road closure
Oct 2026 to Oct 2026
950 m away - Minor
Brookfield Close, HuttonRemedial works · Electricity Network Company Limited · Give and take
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
7.4 km away - Decideddecided Mar 2025
14.8 km away - Decideddecided Feb 2022
19.4 km away - Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019
19.8 km away - Decideddecided Nov 2025
20.0 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
20.2 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hutton Battery Storage (Lower Road) (battery storage, 250 m); Crouch Solar Farm (solar farm, 5.3 km); Crouch Solar Farm (battery storage, 5.3 km); Outwood Farm (Phase 1) (solar farm, 6.4 km); Ford Research And Engineering Centre, Dunton - Solar Farm (solar farm, 6.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.