What's changing near CM1 2LB
Within 2 km, around Melbourne Park, Chignall & Pleshey in Chelmsford. Building, planning, schools, transport, prices and crime.
7new homes completed within 2 km, last 2 years
36homes given permission on brownfield sites since 2021
+3.6%like-for-like prices in Melbourne Park, Chignall & Pleshey, 2024 → 2025 (council +2.4%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 23 m²
15since energy certificates began (2008)
2in CM1 2LB itself
- Extendedcertificate 2025
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
132hours of spills in 2025 between them (typical neighbourhood: about 36)
12spill events counted
- Anglian Water
Avon Rd Sso Chelmsfordinto Tributary River Can12 spills, 132 hours in 2025
350 m away - Anglian Water
Chelmsford - N Mlbn Chignal Road Psinto The One Bridge Brook0 spills, 0 hours in 2025
500 m away - Anglian Water
Writtle - Lawford Lane Psinto Trib Of River Wid0 spills, 0 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
10 planned, approved or being built and 1 running (1 MW between them). Those within 5 km are on the map above.
- Battery storage
Sewage Treatment Works, Lawford Lane - Micro Energy StoragePlanning application in · 200 kW
Aug 2024
2.1 km away - Battery storage
Verge Fronting, Westway - Micro Energy StorageApproved, not yet built · 200 kW
Feb 2026
3.0 km away - Rooftop solar
Bridgemarsh Care Home, Main Road - Solar PanelsApproved, not yet built
Apr 2023
3.1 km away - Rooftop solar
Robjohns Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Oct 2021
3.1 km away - Battery storage
Robjohns Road - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2026
3.4 km away - Battery storage
Visteon Engineering, Springfield Lyons Approach - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2025
5.2 km away - Rooftop solar
Sainsburys, White Hart Lane - Solar PanelsApproved, not yet built · 570 kW
Jul 2025
5.3 km away - Solar farm
LongfieldApproved, not yet built · 500 MW
Jun 2023
8.3 km away - Battery storage
LongfieldApproved, not yet built
Jun 2023
8.3 km away - Solar farm
St Cleres Hall Pit Solar ArrayApproved, not yet built · 25 MW
Oct 2021
8.5 km away
Running nearest: Roxwell Landfill Scheme (landfill gas, 2.6 km).
Road and street works within 1 km
10 permitted works running now or planned, 3 of them major.
- Major
Chignal Road, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
200 m away - Major
Wicklow Avenue, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Major
Wicklow Avenue, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Minor
Chignal Road, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
200 m away - Minor
Scotts Walk, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
400 m away - Minor
Pickwick Avenue, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
500 m away - Minor
Cheviot Drive, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
600 m away - Minor
Cheviot Drive, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
600 m away - Minor
Chignal Road, ChelmsfordHighway improvement works · ESSEX COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away - Minor
Estella Mead, Chelmsford
Major infrastructure projects within 30 km
- Decided
Longfield Solar FarmGenerating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023
8.3 km away - Decideddecided Jan 2024
17.6 km away - Decideddecided Dec 2024
18.4 km away - Decideddecided May 2022
19.7 km away - Decideddecided Mar 2025
28.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.