What's changing near CM12 0PB
Within 2 km, around Billericay Queen's Park in Basildon. Building, planning, schools, transport, prices and crime.
74new homes completed within 2 km, last 2 years
62homes given permission on brownfield sites since 2021
+2.3%like-for-like prices in Billericay Queen's Park, 2024 → 2025 (council +2.9%)
+36%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Oct 2026
Oct 2026
1.8 km away - New homes
9 new homes completed7 flats, 2 houses · Apr 2026
Apr 2026
1.4 km away - New homes
41 new homes completedflats · Jan 2025
Jan 2025
1.0 km away - Planning permissionSept 2022
1.0 km away - Planning permissionMar 2022
1.7 km away - Planning permissionFeb 2022
1.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 25 m²
35since energy certificates began (2008)
1in CM12 0PB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
27 planned, approved or being built and 10 running (199 MW between them). Those within 5 km are on the map above.
- Solar farm
Great Cowbridge Grange Farm, London Road - Solar FarmApproved, not yet built · 10 MW
May 2025
2.3 km away - Solar farm
Outwood Farm (Phase 2)Approved, not yet built · 7 MW
Dec 2014
2.6 km away - Battery storage
Brentwood nergy Storage SystemApproved, not yet built · 50 MW
May 2021
4.0 km away - Solar farm
Barleylands Solar FarmApproved, not yet built · 17 MW
Oct 2024
4.5 km away - Battery storage
Barleylands Solar FarmApproved, not yet built
Oct 2024
4.5 km away - Solar farm
Billericay Solar Farm - Solar FarmApproved, not yet built · 15 MW
Apr 2025
6.1 km away - Battery storage
Miles Gray Road, Steeple View - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2026
6.4 km away - Rooftop solar
Endeavour Point, Endeavour Drive - Solar PV PanelsPlanning application in · 450 kW
Nov 2024
6.4 km away - Rooftop solar
David Lloyd Leisure, Festival Way - Soalr PanelsApproved, not yet built · 400 kW
Feb 2024
6.5 km away - Rooftop solar
Bromfords School, Grange Avenue - RedevelopmentApproved, not yet built · 270 kW
Oct 2025
7.2 km away - Rooftop solar
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major, planned
Stock Road, BillericayHighway improvement works · ESSEX COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major, planned
Walsingham Way, BillericayUtility asset works · BT · Road closure
Feb 2027 to Feb 2027
550 m away - Standard
Radford Court, BillericayHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026
950 m away - Minor
Stock Road, BillericayHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
11.7 km away - Decideddecided Mar 2025
15.8 km away - Decided
Longfield Solar FarmGenerating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023
18.3 km away - Decideddecided Feb 2022
19.6 km away - Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019
20.1 km away - Decideddecided Nov 2025
23.4 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Outwood Farm (Phase 1) (solar farm, 2.6 km); Hutton Battery Storage (Lower Road) (battery storage, 4.3 km); Crays Hall Farm - Solar Arrays (solar farm, 4.6 km); Crouch Solar Farm (solar farm, 6.2 km); Crouch Solar Farm (battery storage, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.