Country England and Wales › Region East of England › Council Basildon › Neighbourhood Bursteads › Postcode CM11 2UB What's changing near CM11 2UB Within 2 km, around Bursteads in Basildon. Building, planning, schools, transport, prices and crime.
64 new homes completed within 2 km, last 2 years
126 homes given permission on brownfield sites since 2021
+7.1% like-for-like prices in Bursteads, 2024 → 2025 (council +2.9%)
-5% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Oct 2026
Oct 2026 1.4 km away New homes 18 new homes completed 6 flats, 12 houses · Nov 2025 – Sep 2026
Sept 2026 1.7 km away New homes 13 new homes completed houses · May 2026 – Sep 2026
Sept 2026 500 m away New homes 7 new homes completed houses · Jan 2026 – May 2026
May 2026 600 m away New homes 5 new homes completed houses · Apr 2025 – Mar 2026
Mar 2026 500 m away New homes 10 new homes completed 1 flats, 9 houses · Sep 2025
Oct 2025 950 m away Planning permission May 2023 350 m away Planning permission Mar 2023 1.3 km away Planning permission Nov 2022 650 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
1 homes extended 2021–2025, typically adding 16 m²
3 since energy certificates began (2008)
2 in CM11 2UB itself
Extended certificate 2020 Extended certificate 2016 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 4 storm overflows within 2 km
60 hours of spills in 2025 between them (typical neighbourhood: about 36)
24 spill events counted
Anglian Water Billericay Water Recycling Centre into Tributary Of R.Crouch Nt 3 spills, 26 hours in 2025
1.1 km away Anglian Water Sso Barleyland Basildon into Upper River Crouch 9 spills, 15 hours in 2025
1.6 km away Anglian Water Billericay Water Recycling Centre into Tributary Of R.Crouch Nt 5 spills, 11 hours in 2025
1.1 km away Anglian Water Outwood Common Cso into Outwood Common Trib R Crouch 7 spills, 9 hours in 2025
1.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 28 planned, approved or being built and 14 running (325 MW between them). Those within 5 km are on the map above.
Solar farm Outwood Farm (Phase 2) Approved, not yet built · 7 MW
Dec 2014 1.0 km away Solar farm Barleylands Solar Farm Approved, not yet built · 17 MW
Oct 2024 1.3 km away Battery storage Barleylands Solar Farm Approved, not yet built
Oct 2024 1.3 km away Rooftop solar Endeavour Point, Endeavour Drive - Solar PV Panels Planning application in · 450 kW
Nov 2024 3.1 km away Battery storage Miles Gray Road, Steeple View - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2026 3.2 km away Rooftop solar David Lloyd Leisure, Festival Way - Soalr Panels Approved, not yet built · 400 kW
Feb 2024 3.2 km away Solar farm Great Cowbridge Grange Farm, London Road - Solar Farm Approved, not yet built · 10 MW
May 2025 3.9 km away Rooftop solar Phoenix House, Christopher Martin Road - Solar Array Approved, not yet built · 270 kW
Dec 2022 4.3 km away Rooftop solar J Sainsbury, Cricketers Way - Solar Panels Approved, not yet built · 620 kW
Mar 2025 4.7 km away Rooftop solar Bromfords School, Grange Avenue - Redevelopment Approved, not yet built · 270 kW
Oct 2025 4.7 km away Battery storage Road and street works within 1 km 3 permitted works running now or planned, 3 of them major.
Major, planned Outwood Common Road, Billericay Utility repair and maintenance works · BT · Road closure
Nov 2026 to Dec 2026 700 m away Major, planned Outwood Common Road, Billericay Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027 850 m away Major, planned Grange Road, Billericay Highway improvement works · ESSEX COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 12.9 km away Decided decided Mar 2025 13.7 km away Decided decided Feb 2022 17.0 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 17.6 km away Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 20.2 km away Decided decided Nov 2025 23.1 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Burnt Mills Industrial Estate, Hovefields Avenue - Battery Energy Storage Approved, not yet built · 200 kW
Running nearest: Outwood Farm (Phase 1) (solar farm, 1.0 km); Crays Hall Farm - Solar Arrays (solar farm, 1.7 km); Nevendon (battery storage, 4.2 km); Nevendon Battery Storage Extension (battery storage, 4.2 km); Ford Research And Engineering Centre, Dunton - Solar Farm (solar farm, 4.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.