What's changing near CM11 2JZ
Within 2 km, around Billericay Central & Sunnymede in Basildon. Building, planning, schools, transport, prices and crime.
122new homes completed within 2 km, last 2 years
194homes given permission on brownfield sites since 2021
-0.8%like-for-like prices in Billericay Central & Sunnymede, 2024 → 2025 (council +2.9%)
+14%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Oct 2026
Oct 2026
450 m away - New homes
18 new homes completed6 flats, 12 houses · Nov 2025 – Sep 2026
Sept 2026
1.6 km away - New homes
13 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.1 km away - New homes
7 new homes completedhouses · Jan 2026 – May 2026
May 2026
950 m away - New homes
9 new homes completed7 flats, 2 houses · Apr 2026
Apr 2026
1.6 km away - Planning permissionMar 2026
1.8 km away - New homes
5 new homes completedhouses · Apr 2025 – Mar 2026
Mar 2026
700 m away - New homes
10 new homes completed1 flats, 9 houses · Sep 2025
Oct 2025
1.2 km away - New homes
41 new homes completedflats · Jan 2025
Jan 2025
2.0 km away - Planning permissionAug 2024
1.8 km away - Planning permission
8homes extended 2021–2025, typically adding 31 m²
18since energy certificates began (2008)
0in CM11 2JZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
45hours of spills in 2025 between them (typical neighbourhood: about 36)
15spill events counted
- Anglian Water
Billericay Water Recycling Centreinto Tributary Of R.Crouch Nt3 spills, 26 hours in 2025
1000 m away - Anglian Water
Billericay Water Recycling Centreinto Tributary Of R.Crouch Nt5 spills, 11 hours in 2025
1000 m away - Anglian Water
Outwood Common Csointo Outwood Common Trib R Crouch7 spills, 9 hours in 2025
300 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
27 planned, approved or being built and 12 running (299 MW between them). Those within 5 km are on the map above.
- Solar farm
Outwood Farm (Phase 2)Approved, not yet built · 7 MW
Dec 2014
550 m away - Solar farm
Barleylands Solar FarmApproved, not yet built · 17 MW
Oct 2024
2.4 km away - Battery storage
Barleylands Solar FarmApproved, not yet built
Oct 2024
2.4 km away - Solar farm
Great Cowbridge Grange Farm, London Road - Solar FarmApproved, not yet built · 10 MW
May 2025
3.3 km away - Rooftop solar
Endeavour Point, Endeavour Drive - Solar PV PanelsPlanning application in · 450 kW
Nov 2024
4.1 km away - Battery storage
Miles Gray Road, Steeple View - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2026
4.3 km away - Rooftop solar
David Lloyd Leisure, Festival Way - Soalr PanelsApproved, not yet built · 400 kW
Feb 2024
4.3 km away - Rooftop solar
Phoenix House, Christopher Martin Road - Solar ArrayApproved, not yet built · 270 kW
Dec 2022
5.2 km away - Rooftop solar
Bromfords School, Grange Avenue - RedevelopmentApproved, not yet built · 270 kW
Oct 2025
5.3 km away - Rooftop solar
J Sainsbury, Cricketers Way - Solar PanelsApproved, not yet built · 620 kW
Mar 2025
5.5 km away - Battery storage
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Outwood Common Road, BillericayUtility repair and maintenance works · BT · Road closure
Nov 2026 to Dec 2026
500 m away - Major, planned
Outwood Common Road, BillericayHighway improvement works · ESSEX COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027
1000 m away - Minor
Monoux Close, BillericayHighway improvement works · ESSEX COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
12.6 km away - Decideddecided Mar 2025
14.5 km away - Decideddecided Feb 2022
18.0 km away - Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019
18.5 km away - Decided
Longfield Solar FarmGenerating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023
19.4 km away - Decideddecided Nov 2025
23.3 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Outwood Farm (Phase 1) (solar farm, 550 m); Crays Hall Farm - Solar Arrays (solar farm, 2.4 km); Nevendon (battery storage, 5.0 km); Nevendon Battery Storage Extension (battery storage, 5.0 km); Ford Research And Engineering Centre, Dunton - Solar Farm (solar farm, 5.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.