127 new homes completed within 2 km, last 2 years
143 homes given permission on brownfield sites since 2021
-0.8% like-for-like prices in Billericay Central & Sunnymede, 2024 → 2025 (council +2.9%)
+14% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Oct 2026
Oct 2026 350 m away New homes 18 new homes completed 6 flats, 12 houses · Nov 2025 – Sep 2026
Sept 2026 1.6 km away New homes 13 new homes completed houses · May 2026 – Sep 2026
Sept 2026 1.6 km away New homes 7 new homes completed houses · Jan 2026 – May 2026
May 2026 1.5 km away New homes 9 new homes completed 7 flats, 2 houses · Apr 2026
Apr 2026 850 m away Planning permission Mar 2026 1.9 km away New homes 5 new homes completed houses · Apr 2025 – Mar 2026
Mar 2026 1.5 km away New homes 10 new homes completed 1 flats, 9 houses · Sep 2025
Oct 2025 1.4 km away New homes 41 new homes completed flats · Jan 2025
Jan 2025 1.2 km away Planning permission Aug 2024 2.0 km away Planning permission 16 homes extended 2021–2025, typically adding 31 m²
34 since energy certificates began (2008)
0 in CM11 2DF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 3 storm overflows within 2 km
45 hours of spills in 2025 between them (typical neighbourhood: about 36)
15 spill events counted
Anglian Water Billericay Water Recycling Centre into Tributary Of R.Crouch Nt 3 spills, 26 hours in 2025
1.8 km away Anglian Water Billericay Water Recycling Centre into Tributary Of R.Crouch Nt 5 spills, 11 hours in 2025
1.8 km away Anglian Water Outwood Common Cso into Outwood Common Trib R Crouch 7 spills, 9 hours in 2025
1.1 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 26 planned, approved or being built and 11 running (199 MW between them). Those within 5 km are on the map above.
Solar farm Outwood Farm (Phase 2) Approved, not yet built · 7 MW
Dec 2014 1.3 km away Solar farm Great Cowbridge Grange Farm, London Road - Solar Farm Approved, not yet built · 10 MW
May 2025 2.5 km away Solar farm Barleylands Solar Farm Approved, not yet built · 17 MW
Oct 2024 3.0 km away Battery storage Barleylands Solar Farm Approved, not yet built
Oct 2024 3.0 km away Battery storage Miles Gray Road, Steeple View - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2026 4.9 km away Rooftop solar Endeavour Point, Endeavour Drive - Solar PV Panels Planning application in · 450 kW
Nov 2024 4.9 km away Battery storage Brentwood nergy Storage System Approved, not yet built · 50 MW
May 2021 4.9 km away Rooftop solar David Lloyd Leisure, Festival Way - Soalr Panels Approved, not yet built · 400 kW
Feb 2024 5.0 km away Rooftop solar Phoenix House, Christopher Martin Road - Solar Array Approved, not yet built · 270 kW
Dec 2022 6.0 km away Rooftop solar Bromfords School, Grange Avenue - Redevelopment Approved, not yet built · 270 kW
Oct 2025 6.1 km away Rooftop solar Road and street works within 1 km 4 permitted works running now or planned.
Standard Radford Court, Billericay Highway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026 750 m away Minor Monoux Close, Billericay Highway improvement works · ESSEX COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026 600 m away Minor Stock Road, Billericay Highway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026 800 m away Minor Southend Road, Billericay Remedial works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 12.0 km away Decided decided Mar 2025 14.7 km away Decided decided Feb 2022 18.3 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 18.9 km away Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 19.2 km away Decided decided Nov 2025 23.0 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Outwood Farm (Phase 1) (solar farm, 1.3 km); Crays Hall Farm - Solar Arrays (solar farm, 3.2 km); Hutton Battery Storage (Lower Road) (battery storage, 5.1 km); Ford Research And Engineering Centre, Dunton - Solar Farm (solar farm, 5.2 km); Crouch Solar Farm (solar farm, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.