Country England and Wales › Region East of England › Council Basildon › Neighbourhood Wickford West › Postcode CM11 1NS What's changing near CM11 1NS Within 2 km, around Wickford West in Basildon. Building, planning, schools, transport, prices and crime.
8 new homes completed within 2 km, last 2 years
7 homes given permission on brownfield sites since 2021
+3.3% like-for-like prices in Wickford West, 2024 → 2025 (council +2.9%)
-1% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first Planning permission Jun 2026 1.2 km away Planning permission Oct 2024 1000 m away Planning permission Aug 2024 1.9 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 49 m²
7 since energy certificates began (2008)
2 in CM11 1NS itself
Extended certificate 2025 Extended certificate 2025 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 4 storm overflows within 2 km
104 hours of spills in 2025 between them (typical neighbourhood: about 36)
14 spill events counted
Anglian Water Wickford Ps into River Crouch 4 spills, 38 hours in 2025
1.5 km away Anglian Water Heath Road Ps into Trib Sandon Brook 2 spills, 30 hours in 2025
1.6 km away Anglian Water Billericay Water Recycling Centre into Tributary Of R.Crouch Nt 3 spills, 26 hours in 2025
1.8 km away Anglian Water Billericay Water Recycling Centre into Tributary Of R.Crouch Nt 5 spills, 11 hours in 2025
1.8 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 28 planned, approved or being built and 14 running (325 MW between them). Those within 5 km are on the map above.
Solar farm Outwood Farm (Phase 2) Approved, not yet built · 7 MW
Dec 2014 2.2 km away Rooftop solar Bromfords School, Grange Avenue - Redevelopment Approved, not yet built · 270 kW
Oct 2025 2.9 km away Solar farm Barleylands Solar Farm Approved, not yet built · 17 MW
Oct 2024 3.4 km away Battery storage Barleylands Solar Farm Approved, not yet built
Oct 2024 3.4 km away Rooftop solar Phoenix House, Christopher Martin Road - Solar Array Approved, not yet built · 270 kW
Dec 2022 3.7 km away Rooftop solar Endeavour Point, Endeavour Drive - Solar PV Panels Planning application in · 450 kW
Nov 2024 3.8 km away Rooftop solar J Sainsbury, Cricketers Way - Solar Panels Approved, not yet built · 620 kW
Mar 2025 3.9 km away Rooftop solar David Lloyd Leisure, Festival Way - Soalr Panels Approved, not yet built · 400 kW
Feb 2024 4.2 km away Solar farm Southlands Solar Farm & Battery Storage Approved, not yet built · 25 MW
Nov 2024 4.7 km away Battery storage Southlands Solar Farm & Battery Storage Approved, not yet built · 57 MW
Nov 2024 4.7 km away Battery storage Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major, planned Church Road, Ramsden Bellhouse Utility asset works · CADENT GAS LIMITED · Multi-way signals
Nov 2026 to Jan 2027 400 m away Minor Church Road, Billericay Highway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 15.4 km away Decided decided Mar 2025 16.0 km away Decided Longfield Solar Farm Generating Stations · Located on land north east of Chelmsford and north of the A12 between Boreham and Hatfield Peverel decided Jun 2023 18.4 km away Decided decided Feb 2022 18.8 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 19.4 km away Decided decided Jan 2024 25.2 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Burnt Mills Industrial Estate, Hovefields Avenue - Battery Energy Storage Approved, not yet built · 200 kW
Running nearest: Crays Hall Farm - Solar Arrays (solar farm, 1.7 km); Outwood Farm (Phase 1) (solar farm, 2.2 km); Nevendon (battery storage, 3.5 km); Nevendon Battery Storage Extension (battery storage, 3.5 km); Dollymans Storage (battery storage, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.