Country England and Wales › Region North West › Council Cheshire West and Chester › Neighbourhood Neston & Parkgate › Postcode CH64 9NH What's changing near CH64 9NH Within 2 km, around Neston & Parkgate in Cheshire West and Chester. Building, planning, schools, transport, prices and crime.
7 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.0% like-for-like prices in Neston & Parkgate, 2024 → 2025 (council +3.4%)
-12% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
1 homes extended 2021–2025, typically adding 16 m²
2 since energy certificates began (2008)
0 in CH64 9NH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
96 hours of spills in 2025 between them (typical neighbourhood: about 36)
31 spill events counted
Dwr Cymru Welsh Water Tankfields Cso into Stanney Brook 23 spills, 74 hours in 2025
1.4 km away Dwr Cymru Welsh Water Gladstone Road Cso into Stanney Brook 8 spills, 22 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 22 planned, approved or being built and 11 running (262 MW between them). Those within 5 km are on the map above.
Solar farm Murrayfield Hospital, Holmwood Drive - Solar Panels Approved, not yet built · 170 kW
Jun 2023 6.0 km away Battery storage Rectory Lane - Energy Storage System Approved, not yet built · 200 MW
May 2025 7.1 km away Battery storage Biffa Waste Services, Dock Road South - Battery Storage Units Approved, not yet built
Dec 2022 7.2 km away Battery storage Deeside Power Station - Battery Storage Facility Approved, not yet built
Aug 2022 7.2 km away Solar farm Land West Of Vicarage Lane Planning application in · 5 MW
May 2015 7.3 km away Battery storage Capenhurst Lane, Capenhurst - Battery storage Being built · 57 MW
Sept 2022 7.6 km away Rooftop solar Iceland Foods, Second Avenue - Solar Photovoltaic Array Approved, not yet built
Jan 2023 7.6 km away Rooftop solar Urenco Uk Limited, Capenhurst Lane - Solar Panels Approved, not yet built · 250 kW
Jul 2023 7.7 km away Energy from waste Hooton Park Being built · 28 MW
Nov 2018 7.9 km away Hydrogen Coleshill Manufacturing, Coleshill Street - Coleshill Green Hydrogen Project Approved, not yet built · 8 MW
Jun 2024 8.0 km away Rooftop solar Road and street works within 1 km 6 permitted works running now or planned, 4 of them major.
Major, planned The Priory, Neston Utility asset works · CADENT GAS LIMITED · Multi-way signals
Dec 2026 to Jan 2027 950 m away Major The Priory, Neston Utility asset works · CADENT GAS LIMITED · Multi-way signals
Sept 2026 to Nov 2026 950 m away Major, planned Abbots Way, Neston Utility asset works · CADENT GAS LIMITED · Give and take
Dec 2026 to Jan 2027 1000 m away Major Abbots Way, Neston Utility asset works · CADENT GAS LIMITED · Give and take
Oct 2026 to Nov 2026 1000 m away Standard Chester High Road, Neston Remedial works · CHESHIRE WEST AND CHESTER COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 400 m away Standard Upper Raby Road, Neston Remedial works · CHESHIRE WEST AND CHESTER COUNCIL · Road closure
Oct 2026 to Oct 2026 450 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decision application due Q3 2025 7.4 km away Decided decided Mar 2024 8.5 km away Pre-application Mersey Tidal Power Project Generating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028 12.5 km away Pre-application application due April 2027 14.7 km away Decision Frodsham Solar Generating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025 21.0 km away Decided decided Sept 2014 22.3 km away Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Aldi Distribution Centre - Neston (rooftop solar, 1.7 km); Shotwick Solar Farm (solar farm, 6.6 km); Parc Adfer EfW (energy from waste, 6.9 km); Bromborough Dock (landfill gas, 7.4 km); Flint Landfill Site Castle Park (solar farm, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.