Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
28hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
United Utilities
Stanton Road Psinto Boardman Brook4 spills, 28 hours in 2025
Victoria Road, Higher BebingtonRemedial works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 100 m away
Minor
Higher Bebington Road, Higher BebingtonRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
Minor
Heath Road, Higher BebingtonRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
Minor
Holmville Road, Higher BebingtonRemedial works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Nov 2026 750 m away
Minor
Pulford Road, BebingtonDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Awel y Môr Offshore Wind FarmGenerating Stations · To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.
decided Sept 2023 28.4 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 29.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.