What's changing near CH63 3HT
Within 2 km, around Higher Bebington in Wirral. Building, planning, schools, transport, prices and crime.
91new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.0%like-for-like prices in Higher Bebington, 2024 → 2025 (council +4.3%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completed2 flats, 7 houses · Jun 2026 – Sep 2026
Sept 2026
700 m away - New homes
21 new homes completedhouses · Nov 2025 – Jun 2026
Jun 2026
1.9 km away - New homes
21 new homes completedhouses · Nov 2025 – Jun 2026
Jun 2026
1.9 km away - New homes
20 new homes completedflats · Nov 2025
Nov 2025
1.8 km away - New homes
14 new homes completedflats · Jun 2025
Jun 2025
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
15homes extended 2021–2025, typically adding 21 m²
26since energy certificates began (2008)
0in CH63 3HT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
28hours of spills in 2025 between them (typical neighbourhood: about 36)
6spill events counted
- United Utilities
Stanton Road Psinto Boardman Brook4 spills, 28 hours in 2025
500 m away - United Utilities
Port Causeway/Crossway Csointo Bromborough Pool · near bathing water: Wallasey2 spills, 0 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
36 planned, approved or being built and 9 running (189 MW between them). Those within 5 km are on the map above.
- Battery storage
Biffa Waste Services, Dock Road South - Battery Storage UnitsApproved, not yet built
Dec 2022
1.8 km away - Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026
4.0 km away - Solar farm
Murrayfield Hospital, Holmwood Drive - Solar PanelsApproved, not yet built · 170 kW
Jun 2023
4.7 km away - Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022
5.1 km away - Wind farm
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022
5.1 km away - Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021
5.2 km away - Rooftop solar
Tesco SuperstoreApproved, not yet built
Apr 2021
5.4 km away - Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025
5.5 km away - Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025
5.6 km away - Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025
5.6 km away
Road and street works within 1 km
22 permitted works running now or planned, 14 of them major.
- Major, planned
Church Road, BebingtonHighway improvement works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026
650 m away - Major
Mobberley Way, SpitalHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Dec 2026
650 m away - Major, planned
Elton Drive, BebingtonHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026
700 m away - Major
Elton Drive, BebingtonHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026
700 m away - Major
Inley Close, SpitalHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Dec 2026
750 m away - Major
Weymoor Close, SpitalHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026
750 m away - Major
Randle Close, SpitalHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026
750 m away - Major
Walford Close, SpitalHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026
800 m away - Major, planned
Hockenhull Close, SpitalHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026800 m away
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
6.8 km away - Decisionapplication due Q3 2025
13.4 km away - Pre-applicationapplication due April 2027
14.2 km away - Decideddecided Mar 2024
14.5 km away - Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025
18.8 km away - Decideddecided Sept 201419.4 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bromborough Dock (landfill gas, 1.9 km); Bromborough Dock Landfill Scheme (landfill gas, 2.3 km); Aldi Distribution Centre - Neston (rooftop solar, 6.4 km); Burbo Bank Energy Storage (battery storage, 8.1 km); Bidston Moss Landfill Scheme (landfill gas, 8.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.