34 planned, approved or being built and 7 running (253 MW between them). Those within 5 km are on the map above.
Battery storage
Biffa Waste Services, Dock Road South - Battery Storage UnitsApproved, not yet built
Dec 2022 3.1 km away
Energy from waste
Hooton ParkBeing built · 28 MW
Nov 2018 4.5 km away
Rooftop solar
Jaguar Landrover Phoenix Building, Eric Foundation Road - Solar ArrayApproved, not yet built · 1 MW
Apr 2025 4.9 km away
Solar farm
Murrayfield Hospital, Holmwood Drive - Solar PanelsApproved, not yet built · 170 kW
Jun 2023 6.0 km away
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 6.5 km away
Battery storage
Cheshire Power Station - Battery Storage FacilityApproved, not yet built · 45 MW
May 2023 6.5 km away
Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025 6.8 km away
Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021 6.9 km away
Battery storage
Capenhurst Lane, Capenhurst - Battery storageBeing built · 57 MW
Sept 2022 6.9 km away
Battery storage
Rectory Lane - Energy Storage SystemApproved, not yet built · 200 MW
May 2025 7.0 km away
Hydrogen
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Stanlow Manufacturing Complex, Phase 1 - Hydrogen Production PlantApproved, not yet built
Jul 2024 7.1 km away
Hydrogen
Application Submitted+W10183:X10183Approved, not yet built
Jul 2024 7.1 km away
Running nearest: Bromborough Dock (landfill gas, 3.2 km); Bromborough Dock Landfill Scheme (landfill gas, 4.1 km); Aldi Distribution Centre - Neston (rooftop solar, 4.1 km); Native River (battery storage, 7.3 km); National Grid Electricity Substation, Capenhurst Lane - Battery Storage (battery storage, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Awel y Môr Offshore Wind FarmGenerating Stations · To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.
decided Sept 2023 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.