Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
34 planned, approved or being built and 6 running (237 MW between them). Those within 5 km are on the map above.
Battery storage
Biffa Waste Services, Dock Road South - Battery Storage UnitsApproved, not yet built
Dec 2022 2.5 km away
Energy from waste
Hooton ParkBeing built · 28 MW
Nov 2018 4.0 km away
Rooftop solar
Jaguar Landrover Phoenix Building, Eric Foundation Road - Solar ArrayApproved, not yet built · 1 MW
Apr 2025 4.4 km away
Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025 6.1 km away
Battery storage
Cheshire Power Station - Battery Storage FacilityApproved, not yet built · 45 MW
May 2023 6.1 km away
Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021 6.2 km away
Solar farm
Murrayfield Hospital, Holmwood Drive - Solar PanelsApproved, not yet built · 170 kW
Jun 2023 6.5 km away
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 6.5 km away
Hydrogen
Stanlow Manufacturing Complex, Phase 1 - Hydrogen Production PlantApproved, not yet built
Jul 2024 6.8 km away
Hydrogen
Application Submitted+W10183:X10183Approved, not yet built
Jul 2024 6.8 km away
Rooftop solar
Road and street works within 1 km
2 permitted works running now or planned.
Standard
Hornby Road, BromboroughUtility repair and maintenance works · MANWEB · No carriageway incursion
Oct 2026 to Oct 2026 950 m away
Minor
Palatine Road, BromboroughRemedial works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Nov 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Capenhurst Lane, Capenhurst - Battery storageBeing built · 57 MW
Sept 2022 6.9 km away
Running nearest: Bromborough Dock (landfill gas, 2.6 km); Bromborough Dock Landfill Scheme (landfill gas, 3.5 km); Aldi Distribution Centre - Neston (rooftop solar, 4.8 km); Native River (battery storage, 7.3 km); National Grid Electricity Substation, Capenhurst Lane - Battery Storage (battery storage, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.