Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
310hours of spills in 2025 between them (typical neighbourhood: about 36)
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025 7.0 km away
Rooftop solar
Garston Shore Road - Solar PanelsApproved, not yet built · 470 kW
Sept 2022 7.2 km away
Running nearest: Bromborough Dock (landfill gas, 4.1 km); Aldi Distribution Centre - Neston (rooftop solar, 4.3 km); Bromborough Dock Landfill Scheme (landfill gas, 5.0 km); Native River (battery storage, 5.6 km); National Grid Electricity Substation, Capenhurst Lane - Battery Storage (battery storage, 6.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.