What's changing near CH62 6AE
Within 2 km, around Bromborough North in Wirral. Building, planning, schools, transport, prices and crime.
11new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+8.6%like-for-like prices in Bromborough North, 2024 → 2025 (council +4.3%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 26 m²
20since energy certificates began (2008)
0in CH62 6AE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
484hours of spills in 2025 between them (typical neighbourhood: about 36)
113spill events counted
- United Utilities
Mayfield Drive Ps1 Cso 512ezinto River Mersey Estuary · near bathing water: Wallasey79 spills, 403 hours in 2025
1.4 km away - United Utilities
Eastham Rake Csointo Dibbinsdale Brook9 spills, 52 hours in 2025
2.0 km away - United Utilities
Eastham Village Csointo Mersey Estuary (Tidal) · near bathing water: Wallasey25 spills, 30 hours in 2025
1.4 km away - United Utilities
Mayfields Drive Ww Ntwk Psinto River Mersey Estuary0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
38 planned, approved or being built and 7 running (237 MW between them). Those within 5 km are on the map above.
- Battery storage
Biffa Waste Services, Dock Road South - Battery Storage UnitsApproved, not yet built
Dec 2022
2.6 km away - Energy from waste
Hooton ParkBeing built · 28 MW
Nov 2018
3.1 km away - Rooftop solar
Jaguar Landrover Phoenix Building, Eric Foundation Road - Solar ArrayApproved, not yet built · 1 MW
Apr 2025
3.5 km away - Battery storage
Cheshire Power Station - Battery Storage FacilityApproved, not yet built · 45 MW
May 2023
5.2 km away - Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025
5.5 km away - Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021
5.9 km away - Hydrogen
Stanlow Manufacturing Complex, Phase 1 - Hydrogen Production PlantApproved, not yet built
Jul 2024
5.9 km away - Hydrogen
Application Submitted+W10183:X10183Approved, not yet built
Jul 2024
5.9 km away - Rooftop solar
Garston Shore Road - Solar PanelsApproved, not yet built · 470 kW
Sept 2022
6.4 km away - Battery storage
Capenhurst Lane, Capenhurst - Battery storageBeing built · 57 MW
Sept 2022
6.5 km away - Rooftop solar
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Old Hall Road, BromboroughHighway improvement works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026
800 m away - Major
Old Hall Road, BromboroughHighway improvement works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
800 m away - Minor
Manor Road, EasthamDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026
400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
9.3 km away - Pre-applicationapplication due April 2027
11.0 km away - Decisionapplication due Q3 2025
12.7 km away - Decideddecided Mar 2024
14.0 km away - Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025
16.0 km away - Decideddecided Sept 201422.6 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bromborough Dock (landfill gas, 2.6 km); Bromborough Dock Landfill Scheme (landfill gas, 3.5 km); Aldi Distribution Centre - Neston (rooftop solar, 5.5 km); Native River (battery storage, 6.9 km); National Grid Electricity Substation, Capenhurst Lane - Battery Storage (battery storage, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.