Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
3,167hours of spills in 2025 between them (typical neighbourhood: about 36)
401spill events counted
United Utilities
Bromborough Wwtwinto Mersey Estuary · near bathing water: Wallasey122 spills, 1,426 hours in 2025
1.2 km away
United Utilities
Dock Road South Csointo Mersey Estuary · near bathing water: Wallasey86 spills, 727 hours in 2025
1.8 km away
United Utilities
Bromborough Wwtwinto Mersey Estuary · near bathing water: Wallasey94 spills, 666 hours in 2025
1.2 km away
United Utilities
Dock Road South Csointo River Mersey Estuary46 spills, 190 hours in 2025
1.8 km away
United Utilities
The Dell Combined Sewer Overflowinto The Mersey Estuary · near bathing water: Wallasey50 spills, 157 hours in 2025
1.4 km away
United Utilities
Bromborough Pool Village Ps 51026into River Mersey Estuary · near bathing water: Wallasey1 spills, 2 hours in 2025
1.8 km away
United Utilities
Port Causeway/Crossway Csointo Bromborough Pool · near bathing water: Wallasey2 spills, 0 hours in 2025
40 planned, approved or being built and 8 running (132 MW between them). Those within 5 km are on the map above.
Battery storage
Biffa Waste Services, Dock Road South - Battery Storage UnitsApproved, not yet built
Dec 2022 1.5 km away
Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 3.5 km away
Wind farm
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 3.5 km away
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 3.7 km away
Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021 3.7 km away
Rooftop solar
Tesco SuperstoreApproved, not yet built
Apr 2021 3.7 km away
Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025 4.1 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 4.8 km away
Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026 5.2 km away
Solar farm
Murrayfield Hospital, Holmwood Drive - Solar PanelsApproved, not yet built · 170 kW
Jun 2023 5.6 km away
Rooftop solar
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
Major, planned
Bebington Road, BebingtonHighway improvement works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Nov 2026 300 m away
Standard
Brownlow Road, New FerryDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 400 m away
Standard
Queen Marys Drive, Port SunlightDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 450 m away
Minor
New Chester Road, Rock FerryDisconnection or alteration of supply · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Oct 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 27.2 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.