Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
234hours of spills in 2025 between them (typical neighbourhood: about 36)
92spill events counted
United Utilities
Harrington Avenue Csointo Unnamed Trib Of Carr Drain A Trib Of The River Birket · near bathing water: Wallasey32 spills, 125 hours in 2025
1.9 km away
United Utilities
Whitebeam Walk Cso 513pxinto Greasby Brook Trib Arrow Brook33 spills, 78 hours in 2025
1.8 km away
United Utilities
Frankby Close Cso 513mminto Greasby Brook20 spills, 28 hours in 2025
1.8 km away
United Utilities
Rear Of 65 Fulton Ave Cso 5130rinto Newton Brook3 spills, 3 hours in 2025
100 m away
United Utilities
Black Horse Hill Cso 511evinto Via A Surface Water Sewer To Newton Brook, A Tributary Of River Birket · near bathing water: West Kirby1 spills, 0 hours in 2025
550 m away
United Utilities
Ennisdale Drive Csointo Newton Brook · near bathing water: West Kirby2 spills, 0 hours in 2025
550 m away
United Utilities
West Kirby Pumping Stationinto Un-Named Tributary Of The River Birket · near bathing water: Wallasey1 spills, 0 hours in 2025
9 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025 5.3 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025 5.3 km away
Solar farm
Murrayfield Hospital, Holmwood Drive - Solar PanelsApproved, not yet built · 170 kW
Jun 2023 6.0 km away
Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025 6.8 km away
Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026 6.8 km away
Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023 7.0 km away
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 7.5 km away
Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025 8.1 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 9.7 km away
Running nearest: Bidston Moss Landfill Scheme (landfill gas, 6.6 km); Burbo Bank Energy Storage (battery storage, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned.
Minor
Hillside Road, NewtonDisconnection or alteration of supply · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away
Minor
Column Road, NewtonDisconnection or alteration of supply · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Nov 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.