Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
129hours of spills in 2025 between them (typical neighbourhood: about 36)
40spill events counted
United Utilities
Harrington Avenue Csointo Unnamed Trib Of Carr Drain A Trib Of The River Birket · near bathing water: Wallasey32 spills, 125 hours in 2025
1.6 km away
United Utilities
Rear Of 65 Fulton Ave Cso 5130rinto Newton Brook3 spills, 3 hours in 2025
1.9 km away
United Utilities
Black Horse Hill Cso 511evinto Via A Surface Water Sewer To Newton Brook, A Tributary Of River Birket · near bathing water: West Kirby1 spills, 0 hours in 2025
1.6 km away
United Utilities
Tbcinto Dee Estuary1 spills, 0 hours in 2025
1.2 km away
United Utilities
Ennisdale Drive Csointo Newton Brook · near bathing water: West Kirby2 spills, 0 hours in 2025
1.6 km away
United Utilities
West Kirby Pumping Stationinto Un-Named Tributary Of The River Birket · near bathing water: Wallasey1 spills, 0 hours in 2025
500 m away
United Utilities
Stanley Road Pumping Stationinto Irish Sea · near bathing water: West Kirby; Meols0 spills, 0 hours in 2025
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.