Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
1,080hours of spills in 2025 between them (typical neighbourhood: about 36)
224spill events counted
United Utilities
North Wirral Wwtwinto River Birket164 spills, 833 hours in 2025
1.1 km away
United Utilities
Wastdale Drive Csointo Arrowe Brook · near bathing water: Moreton35 spills, 178 hours in 2025
200 m away
United Utilities
Saughall Massie Rd/Devonshire Rdcsointo Arrowe Brook · near bathing water: Moreton12 spills, 39 hours in 2025
1.7 km away
United Utilities
389 Hoylake Road Csointo Arrowe Brook A Trib Of The River Birket · near bathing water: Moreton6 spills, 18 hours in 2025
800 m away
United Utilities
Garrick Avenue Csointo Arrowe Brook · near bathing water: Moreton3 spills, 6 hours in 2025
550 m away
United Utilities
Acton Lane Combined Sewer Overflowinto Arrowe Brook A Trib Of The River Birket · near bathing water: Moreton3 spills, 6 hours in 2025
1.0 km away
United Utilities
Kingfisher Way Csointo Arrowe Brook · near bathing water: Meols1 spills, 1 hours in 2025
1.3 km away
United Utilities
Maryland Lane Csointo Arrowe Brook · near bathing water: Moreton0 spills, 0 hours in 2025
29 planned, approved or being built and 4 running (17 MW between them). Those within 5 km are on the map above.
Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025 3.9 km away
Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026 3.9 km away
Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023 4.1 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025 4.6 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025 4.6 km away
Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025 4.8 km away
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 6.4 km away
Solar farm
Murrayfield Hospital, Holmwood Drive - Solar PanelsApproved, not yet built · 170 kW
Jun 2023 6.8 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 7.4 km away
Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024 8.6 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major, planned
Joan Avenue, MoretonUtility repair and maintenance works · BT · Road closure
Nov 2026 to Nov 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 28.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.