What's changing near CH46 1RN
Within 2 km, around Leasowe in Wirral. Building, planning, schools, transport, prices and crime.
36new homes completed within 2 km, last 2 years
40homes given permission on brownfield sites since 2021
+2.2%like-for-like prices in Leasowe, 2024 → 2025 (council +4.3%)
-14%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 27 m²
15since energy certificates began (2008)
0in CH46 1RN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
445hours of spills in 2025 between them (typical neighbourhood: about 36)
121spill events counted
- United Utilities
Rear Of 25 Wheatfield Close Csointo River Fender47 spills, 258 hours in 2025
1.9 km away - United Utilities
Hoylake Road/Chapelhill Csointo River Fender · near bathing water: Moreton26 spills, 94 hours in 2025
1.4 km away - United Utilities
Bidston By-Pass Csointo River Birket · near bathing water: Wallasey13 spills, 47 hours in 2025
1.5 km away - United Utilities
Upton Road Cso 513n8into River Fender28 spills, 42 hours in 2025
1.9 km away - United Utilities
Briscoe Drive Cso 511g9into River Fender7 spills, 4 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
40 planned, approved or being built and 4 running (17 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025
2.1 km away - Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026
2.1 km away - Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025
2.4 km away - Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023
2.4 km away - Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025
4.8 km away - Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025
4.8 km away - Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023
5.7 km away - Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026
5.8 km away - Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024
6.3 km away - Rooftop solar
Temp Control Building - Solar PanelsApproved, not yet built
Mar 2024
6.5 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
6.2 km away - Decideddecided Sept 2014
9.6 km away - Decisionapplication due Q3 2025
20.0 km away - Decideddecided Mar 2024
20.5 km away - Pre-applicationapplication due April 2027
23.8 km away - Decideddecided May 2015
23.8 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bidston Moss Landfill Scheme (landfill gas, 1.6 km); Burbo Bank Energy Storage (battery storage, 2.9 km); Royal Seaforth Dock Wind Farm (wind farm, 6.7 km); Port of Liverpool - wind (wind farm, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.