Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
14hours of spills in 2025 between them (typical neighbourhood: about 36)
24spill events counted
United Utilities
New Brighton Pumping Stationinto Tidal River Mersey · near bathing water: Moreton; Wallasey3 spills, 6 hours in 2025
500 m away
United Utilities
Rimrose Brook Csointo Mersey Estuary · near bathing water: Wallasey10 spills, 4 hours in 2025
1.9 km away
United Utilities
Bootle Northern Opc Cso 99102into Mersey Estuary · near bathing water: Wallasey9 spills, 3 hours in 2025
1.9 km away
United Utilities
Strand Road Storm Sewer Overflowinto River Mersey · near bathing water: Wallasey2 spills, 1 hours in 2025
1.6 km away
United Utilities
Wallasey Coastal Drive 51052into River Mersey Estuary · near bathing water: Meols; Moreton; Wallasey0 spills, 0 hours in 2025
53 planned, approved or being built and 7 running (137 MW between them). Those within 5 km are on the map above.
Rooftop solar
Temp Control Building - Solar PanelsApproved, not yet built
Mar 2024 2.2 km away
Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025 2.3 km away
Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024 2.5 km away
Rooftop solar
Royal Seaforth Dock - Solar PanelsApproved, not yet built
Feb 2024 2.7 km away
Rooftop solar
Multiuser 2 Building, Regent Road - Solar PanelsApproved, not yet built
Feb 2024 2.8 km away
Rooftop solar
Bulk Powder Terminals, Regent Road - Solar PanelsApproved, not yet built · 700 kW
Feb 2024 2.8 km away
Rooftop solar
Multiuser 4 Building - Solar PanelsApproved, not yet built
Feb 2024 2.8 km away
Rooftop solar
Multiuser 1 Building, Regent Road - Solar PanelsApproved, not yet built
Feb 2024 2.8 km away
Rooftop solar
Royal Seaforth Dock, New Jenkins Sheds - Solar PanelsApproved, not yet built · 310 kW
Feb 2024 2.8 km away
Rooftop solar
Multiuser 5 Building, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 2.9 km away
Rooftop solar
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major, planned
Kings Parade, New BrightonHighway improvement works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 350 m away
Standard
Wellington Road, New BrightonUtility repair and maintenance works · MANWEB · Give and take
Oct 2026 to Oct 2026 700 m away
Minor
Atherton Street, New BrightonUtility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Cwt Maintenance Building, Regent Road - Solar PanelsApproved, not yet built
Feb 2024 2.9 km away
Rooftop solar
Waste Care, Lower Bank View - Solar PanelsApproved, not yet built · 210 kW
Feb 2025 2.9 km away
Running nearest: Port of Liverpool - wind (wind farm, 2.7 km); Royal Seaforth Dock Wind Farm (wind farm, 2.9 km); Burbo Bank Energy Storage (battery storage, 3.1 km); Bidston Moss Landfill Scheme (landfill gas, 3.9 km); Land at Carnegie Road (battery storage, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 25.4 km away
Decided
Awel y Môr Offshore Wind FarmGenerating Stations · To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.
decided Sept 2023 29.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.