What's changing near CH44 9AZ
Within 2 km, around Egremont in Wirral. Building, planning, schools, transport, prices and crime.
395new homes completed within 2 km, last 2 years
29homes given permission on brownfield sites since 2021
+6.9%like-for-like prices in Egremont, 2024 → 2025 (council +4.3%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Oct 2025
Oct 2025
1.2 km away - New homes
8 new homes completedhouses · Sep 2025
Sept 2025
1.9 km away - New homes
15 new homes completedhouses · Jun 2025 – Aug 2025
Aug 2025
1.9 km away - New homes
88 new homes completedflats · Jan 2025
Feb 2025
850 m away - New homes
88 new homes completedflats · Jan 2025
Jan 2025
850 m away - New homes
88 new homes completedflats · Jan 2025
Jan 2025
850 m away - New homes
86 new homes completedflats · Jan 2025
Jan 2025
850 m away - New schoolFeb 2024
900 m away - New schoolMay 2023
1.8 km away - Planning permissionJan 2022
750 m away - Planning permission
26homes extended 2021–2025, typically adding 24 m²
73since energy certificates began (2008)
0in CH44 9AZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
908hours of spills in 2025 between them (typical neighbourhood: about 36)
214spill events counted
- United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton164 spills, 769 hours in 2025
1.3 km away - United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton48 spills, 139 hours in 2025
1.3 km away - United Utilities
Battery Lane Csointo The Mersey Estuary · near bathing water: Wallasey2 spills, 0 hours in 2025
2.0 km away - United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton0 spills, 0 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
54 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023
1.8 km away - Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023
2.3 km away - Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025
2.4 km away - Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025
2.5 km away - Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026
2.5 km away - Rooftop solar
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022
2.6 km away - Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024
2.7 km away - Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026
2.7 km away - Rooftop solar
Bulk Powder Terminals, Regent Road - Solar PanelsApproved, not yet built · 700 kW
Feb 2024
3.3 km away - Rooftop solar
Steel Terminal, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024
3.4 km away
Road and street works within 1 km
6 permitted works running now or planned.
- Standard
Wheatland Lane, SeacombeUtility repair and maintenance works · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Nov 2026
500 m away - Standard
Church Lane, EgremontDisconnection or alteration of supply · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026
650 m away - Minor
Rufford Road, PoultonDisconnection or alteration of supply · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Church Lane, EgremontRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
650 m away - Minor
St Pauls Road, SeacombeRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away - Minor
Martins Lane, LiscardUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
1.9 km away - Decideddecided Sept 2014
13.0 km away - Decisionapplication due Q3 2025
20.1 km away - Pre-applicationapplication due April 2027
20.6 km away - Decideddecided May 2015
20.7 km away - Decideddecided Mar 2024
20.9 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Burbo Bank Energy Storage (battery storage, 1.5 km); Bidston Moss Landfill Scheme (landfill gas, 2.8 km); Port of Liverpool - wind (wind farm, 4.5 km); Royal Seaforth Dock Wind Farm (wind farm, 5.8 km); Land at Carnegie Road (battery storage, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.