What's changing near CH44 6QD
Within 2 km, around Seacombe in Wirral. Building, planning, schools, transport, prices and crime.
792new homes completed within 2 km, last 2 years
29homes given permission on brownfield sites since 2021
+1.1%like-for-like prices in Seacombe, 2024 → 2025 (council +4.3%)
+8%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Oct 2025
Oct 2025
1.5 km away - New homes
64 new homes completedflats · Aug 2025 – Sep 2025
Sept 2025
1.8 km away - New homes
70 new homes completedflats · Aug 2025 – Sep 2025
Sept 2025
1.8 km away - New homes
72 new homes completedflats · Aug 2025 – Sep 2025
Sept 2025
1.8 km away - New homes
72 new homes completedflats · Aug 2025 – Sep 2025
Sept 2025
1.8 km away - New homes
8 new homes completedhouses · Sep 2025
Sept 2025
2.0 km away - New homes
67 new homes completedflats · Jul 2025
Jul 2025
1.5 km away - New homes
68 new homes completedflats · Jul 2025
Jul 2025
1.5 km away - New homes
88 new homes completedflats · Jan 2025
Feb 2025
1.2 km away - New homes
88 new homes completedflats · Jan 2025
Jan 2025
1.2 km away - New homes
88 new homes completedflats · Jan 2025
Jan 2025
1.1 km away - New homes
86 new homes completedflats · Jan 2025
Jan 2025
1.1 km away - New school
20homes extended 2021–2025, typically adding 22 m²
65since energy certificates began (2008)
3in CH44 6QD itself
- Extendedcertificate 2025
- Extendedcertificate 2016
- Extendedcertificate 2016
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
1,912hours of spills in 2025 between them (typical neighbourhood: about 36)
409spill events counted
- United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton164 spills, 769 hours in 2025
950 m away - United Utilities
Liverpool Wwtwinto Mersey Estuary · near bathing water: Wallasey118 spills, 563 hours in 2025
1.8 km away - United Utilities
Liverpool Wwtwinto Mersey Estuary · near bathing water: Wallasey60 spills, 434 hours in 2025
1.8 km away - United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton48 spills, 139 hours in 2025
950 m away - United Utilities
Beacons Gutter Ssointo Mersey Estuary · near bathing water: Wallasey10 spills, 4 hours in 2025
1.9 km away - United Utilities
St Nicholas Storm Sewer Overflowinto Mersey Estuary · near bathing water: Wallasey7 spills, 3 hours in 2025
2.0 km away - United Utilities
Battery Lane Csointo The Mersey Estuary · near bathing water: Wallasey2 spills, 0 hours in 2025
1.4 km away - United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton0 spills, 0 hours in 2025
950 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
54 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023
1.8 km away - Rooftop solar
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022
2.1 km away - Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024
2.3 km away - Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026
2.4 km away - Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025
2.8 km away - Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023
2.8 km away - Rooftop solar
Bulk Powder Terminals, Regent Road - Solar PanelsApproved, not yet built · 700 kW
Feb 2024
2.9 km away - Rooftop solar
Steel Terminal, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024
3.0 km away - Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025
3.0 km away - Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026
3.0 km away
Road and street works within 1 km
5 permitted works running now or planned.
- Standard
Church Lane, EgremontDisconnection or alteration of supply · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026
350 m away - Standard
Wheatland Lane, SeacombeUtility repair and maintenance works · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Nov 2026
400 m away - Minor
Church Lane, EgremontRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
350 m away - Minor
St Pauls Road, SeacombeRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
600 m away - Minor
Rufford Road, PoultonDisconnection or alteration of supply · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
1.6 km away - Decideddecided Sept 2014
13.4 km away - Decideddecided May 2015
20.2 km away - Decisionapplication due Q3 2025
20.3 km away - Pre-applicationapplication due April 2027
20.4 km away - Decideddecided Mar 2024
21.2 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Burbo Bank Energy Storage (battery storage, 2.0 km); Bidston Moss Landfill Scheme (landfill gas, 3.3 km); Port of Liverpool - wind (wind farm, 4.1 km); Royal Seaforth Dock Wind Farm (wind farm, 5.7 km); Land at Carnegie Road (battery storage, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.